Similar Projects
GAOA Lamoille Pavement Preservation Phase 2 Project for the Humboldt-Toiyabe National Forest
Alteration
Design
$250,000 to $500,000 est. value
Elko, NV

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Downtown Development Infrastructure Project Phase 1
Infrastructure
Post-Bid
$7,100,000 est. value
West Wendover, NV

Metropolis Roadbed Stabilization and Chip Seal Project
Results
Less than $1,200,000 est. value
Elko, NV

Cold In - Place Recycling with Double Chip Seal
Results
$1,300,000 to $1,550,000 est. value
NV 89835

City of Carlin 2nd Street Paving Project
Infrastructure
Post-Bid
$350,000 est. value
Carlin, NV 89822

2021 Micro Slurry Project
Infrastructure
Results
Elko, NV

Jennings Way Sidewalk - 2021
Infrastructure
Post-Bid
Elko, NV 89801

Roads Chip Seal 2021 Project
Infrastructure
Results
Less than $1,100,000 est. value
Elko, NV

Highway Improvement
Infrastructure
Post-Bid
$510,000 est. value
Elko, NV 89802

VFW Drive Improvements
Term Contract
Results
Elko, NV 89801

Metropolis Road Micro-Pave Slurry Project
Infrastructure
Post-Bid
$780,000 CJ est. value
Elko, NV 89801

Coldmill, Place Leveling Course and Plantmix Bituminous Surface with Open Grade
Infrastructure
Results
$11,500,000 to $13,500,000 est. value
NV

Spruce Road Rehabilitation Project
Infrastructure
Results
$2,450,000 est. value
Elko, NV 89801

2022 Micro Slurry Project
Infrastructure
Results
$564,007 est. value
Elko, NV

Last Updated 08/08/2022 11:44 AM
Project Title

Pavement Maintenance, Carlin Readiness Center

Physical Address View project details and contacts
City, State (County) Carlin, NV 89822   (Elko County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $294,007 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Base Bid Description: Perform pavement maintenance to include patching, crack seal, micro surface and striping, and limited mill and fill, all per plans. Contract Time: 30 calendar days. Liquidated Damages: $260.00 per day. Prevailing Wages must be paid on this project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents