Similar Projects
Fairview Senior Apartments
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Normal, IL 61761

Fairview Senior Apartments
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Normal, IL 61761

HMA Resurfacing of Various Streets
Post-Bid
Normal, IL 61761

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Designed Overlay on Old Rte 66 From Logan Co Line to Shirley for a Net
Results
IL

Cold-In-Place Recycling with Hma Binder and Surface Course on Ch 39 from White Oak Road to Ziebarth Road
Results
IL

Heartland Community College - Agriculture Complex
New Construction, Infrastructure - 30,322 SF
Construction
$16,300,000 CJ est. value
Normal, IL 61761

8,450 Cu Yard
Infrastructure
Post-Bid
Bloomington, IL

245 Miles of Partial Width Resurfacing Under Veterans Parkway and Under I-55B in Bloomington
Results
Bloomington, IL

Architectural/Engineer Services for Downtown Bloomington Streetscape Improvements
Infrastructure
Post-Bid
Bloomington, IL

Class A Special Patching on Nearly 2 Miles of Eb/Wb 1-74 Near Carlock
Results
Carlock, IL

Asphalt
Infrastructure
Post-Bid
Danvers, IL 61732

Brookside Bridge
Results
$185,018 est. value
Downs, IL

BNWRD CSO Lagoon Outfall Improvements
Infrastructure
Post-Bid
Bloomington, IL

Fort Jesse Road Guardrail Installation
Results
Towanda, IL

Last Updated 09/06/2022 02:33 PM
Project Title

Standard Overlay, Milled Rumble Strip New Shoulders on IL 9/ US 150

Physical Address View project details and contacts
City, State (County) Bloomington, IL 61705   (McLean County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

7.097 miles, 3P-Policy Standard Overlay, Milled Rumble Strip New Shoulders ILL 122 TO WALTON DR IN BLOOMINGTON, Culvert Repair, STREAM 0.2 Ml W OF JCT US 150 W OF BLOOMINGTON. Region 3 District 5 Federal Project # STPHSIPNHPPHBFP8W33(690) County(s) McLean Key Route(s) FAP 693 Marked Route(s) IL 9/US 150 Section(s) 128RS-2 & 129RS-4 State Job #(s) C-95-045-12 PPS #(s) 0-00818-5001 5-52974-0000 5-52974-0100 VBP % 0.00 Completion Date : 70 Working Days Questions not accepted as of September 13, 2022 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashiers check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared not responsive, it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, September 02, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 042 - Standard Overlay, Milled Rumble Strip New Shoulders on IL 9/ US 150

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents