Similar Projects
Replace/Repair Roofing Systems
Alteration
Design
$219,200 est. value

Update Global ASNT - Building 5008
Alteration
Bidding
$25,000 to $100,000 est. value
Scott Air Force Base, IL

Roofing Repair and Maintenance
Post-Bid

Roof Replacement
Post-Bid
Belleville, IL 62220

Roof Replacement Work at Saint Libory Elementary School
Results
Saint Libory, IL 62282

Roof and Interior Repairs
Results
East Saint Louis, IL 62205

Replace/Repair Roofing Systems at Multiple Sites
Alteration
Post-Bid
Less than $250,000 est. value

Health/Life Safety Improvements Partial Roofing Replacement
Results
Swansea, IL 62226

Ballasted Roof Replacement at The Family Living Center
Alteration
Post-Bid
East Saint Louis, IL 62205

Re-Roof Several Schools
Results
Belleville, IL

Re-Roof Several Schools
Alteration
Post-Bid
$585,000 est. value
East Saint Louis, IL

Roof Repair Services
Alteration
Results
IL 62201

Roofing Replacement
Alteration
Results
Fairview Heights, IL 62208

Replace Roofing Systems
Alteration
Results
Less than $2,000,000 est. value
Collinsville, IL 62234

Roof Replacement and Repairs of Amp 8 Scattered Sites
Alteration
Results
East Saint Louis, IL

Last Updated 05/10/2022 12:57 PM
Project Title

Roof Replacement at Phoenix Court

Physical Address View project details and contacts
City, State (County) East Saint Louis, IL 62203   (Saint Clair County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consists of five single-story residential duplex buildings originally constructed in 2008. The work includes, but is not limited to, removal of the existing asphalt shingles, underlayment, and drip edge flashing; installation of new synthetic roof underlayment; installation of ice dam protection and continuous ridge vents; and installation of new 30-year minimum fiberglass-based asphalt shingles. All work must be completed and accepted within 60 calendar days The Contractor shall furnish all necessary labor, supervisors, materials, equipment, supplies, levies, fees and like expenses as well as all other services and facilities of every nature, except as herein specified, whatsoever necessary for the performance of the Contract and to deliver all improvements embraced in the Contract, complete in every respect within the specified time.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents