Similar Projects
New Jail Development - Sarpy County
New Construction, Infrastructure - 146,000 SF
Design
$68,500,000 CJ est. value
Papillion, NE 68046

The Bridge Flats
New Construction, Infrastructure - 18,000 SF
Design
$13,000,000 CJ est. value
Bellevue, NE 68005

SATCOM - MILSTAR Building OFFUT AFB
New Construction, Infrastructure
Bidding
$40,000,000 CJ est. value
Bellevue, NE 68123

SATCOM - MILSTAR Building OFFUT AFB
New Construction, Infrastructure
Bidding
$40,000,000 CJ est. value
Bellevue, NE 68123

District 2 On-Call Util Location Service
Term Contract, Infrastructure
Post-Bid
$5,000,000 est. value

SCCWWA Phase 1A - Lift Stations (LS), Force Mains (FM), & Zweibel Creek - 3 Interceptor (ZC-3)
New Construction, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Springfield, NE 68059

Aspen Creek North - Phase 2 Water Main Improvements
Infrastructure
Results
Gretna, NE

US-6/Harrison ST
Infrastructure
Results
$5,000,000 est. value
NE

Stadium Team Meeting Room Building - Papillion LaVista Public Schools
New Construction, Infrastructure - 4,950 SF
Construction
$940,500 CJ est. value
Papillion, NE 68046

Nebraska Crossing
Addition, New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Gretna, NE 68028

Crisis Stabilization Center - Sarpy County
New Construction, Infrastructure
Pending Verification
$13,000,000 CJ est. value
Bellevue, NE 68005

RFP - Sewer Rate Study
Term Contract
Bidding
La Vista, NE 68128

Nebraska Army National Guard Bellevue Readiness Center (Milcon)
New Construction, Infrastructure - 95,000 SF
Post-Bid
$33,000,000 CJ est. value
Bellevue, NE 68123

Building V Water Main Relocation Nebraska Crossing Outlets
Infrastructure
Results
Gretna, NE

R&R Commerce Park South Additional Phases / Sarpy Industrial / Papillion
New Construction, Infrastructure - 862,000 SF
Pending Verification
$449,000,000 CJ est. value
Richland Viii, NE 68138

Last Updated 11/16/2022 11:34 PM
Project Title

Southern Sarpy County Regional Wastewater System - Phase 1A - LS & FM

Physical Address View project details and contacts
City, State (County) Springfield, NE 68059   (Sarpy County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Sub-Bidding Closed, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $40,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Hawkins Construction Company of Omaha, Nebraska, on behalf of the Sarpy County and Cities Wastewater Agency (Agency), and acting as the Agency's Construction Manager at Risk, is requesting Proposals for the construction of the following project: Southern Sarpy County Regional Wastewater System - Phase 1A The Project includes the following Work: The proposed project area is generally located between the City of Springfield's Wastewater Treatment Facility (SWWTF) at 17305 S Hwy 50 and extends east to the City of Omaha's Papillion Creek Waste Resource Recovery Facility (PCWRRF) located at 15705 Harlan Lewis Road in Bellevue, Nebraska. Phase 1A will include three (3) lift stations, approximately 16 miles of dual line force main interceptor and approximately 1.5 miles of gravity main interceptor. Construction of various other trenchless crossings of private property, roadways, or railroad via HDD or pilot-tube auger boring. Work will be constructed complete with sanitary manholes, air vault structures, pigging stations, testing, connection to the existing interceptor sewer, site electrical, site grading, earthwork, seeding and restoration, and all required appurtenant work. The work will consist of 7 separate bid packages as follows: Pipe Procurement (Material Only) Lift Stations (3 separate locations) - HCC acting as CM/GC Zweibel Creek Gravity Interceptor Force Main Segment 1 Force Main Segment 2 Force Main Segment 3 Force Main Segment 4 The project duration can generally be described as 24 months beginning in August 2022. This project has the following State & Federal Requirements MBE/WBE/DBE Subcontractor Participation Fair Share per 40 CFR 35.6580. - 14% (6% MBE & 8% WBE) E-Verify Federal Immigration Verification Davis Bacon Prevailing Wage & Certified Payroll American Iron and Steel (AIS) Products per FWPCA Section 608 A full listing of the State and Federal Regulations can be found at and is based upon the EPA's listing of "Additional Information on Cross-Cutting Federal Authorities" (http://water.epa.gov/grants_funding/dwsrf/xcuts.cfm) and the EPA's "Cross-Cutting Federal Authorities: A Handbook on Their Application in the Clean Water and Drinking Water State Revolving Fund Programs" (October 2013: http://www2.epa.gov/sites/production/files/2015-08/documents/crosscutterhandbook.pdf) as of October 12, 2015. This list is subject to change based upon the federal authorities of the EPA.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents