Similar Projects
Last Updated | 11/16/2022 11:34 PM |
Project Title | Southern Sarpy County Regional Wastewater System - Phase 1A - LS & FM |
Physical Address | View project details and contacts |
City, State (County) | Springfield, NE 68059 (Sarpy County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding Closed, Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $40,000,000 [brand] Estimate |
Plans Available from | Construction Manager |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Hawkins Construction Company of Omaha, Nebraska, on behalf of the Sarpy County and Cities Wastewater Agency (Agency), and acting as the Agency's Construction Manager at Risk, is requesting Proposals for the construction of the following project: Southern Sarpy County Regional Wastewater System - Phase 1A The Project includes the following Work: The proposed project area is generally located between the City of Springfield's Wastewater Treatment Facility (SWWTF) at 17305 S Hwy 50 and extends east to the City of Omaha's Papillion Creek Waste Resource Recovery Facility (PCWRRF) located at 15705 Harlan Lewis Road in Bellevue, Nebraska. Phase 1A will include three (3) lift stations, approximately 16 miles of dual line force main interceptor and approximately 1.5 miles of gravity main interceptor. Construction of various other trenchless crossings of private property, roadways, or railroad via HDD or pilot-tube auger boring. Work will be constructed complete with sanitary manholes, air vault structures, pigging stations, testing, connection to the existing interceptor sewer, site electrical, site grading, earthwork, seeding and restoration, and all required appurtenant work. The work will consist of 7 separate bid packages as follows: Pipe Procurement (Material Only) Lift Stations (3 separate locations) - HCC acting as CM/GC Zweibel Creek Gravity Interceptor Force Main Segment 1 Force Main Segment 2 Force Main Segment 3 Force Main Segment 4 The project duration can generally be described as 24 months beginning in August 2022. This project has the following State & Federal Requirements MBE/WBE/DBE Subcontractor Participation Fair Share per 40 CFR 35.6580. - 14% (6% MBE & 8% WBE) E-Verify Federal Immigration Verification Davis Bacon Prevailing Wage & Certified Payroll American Iron and Steel (AIS) Products per FWPCA Section 608 A full listing of the State and Federal Regulations can be found at and is based upon the EPA's listing of "Additional Information on Cross-Cutting Federal Authorities" (http://water.epa.gov/grants_funding/dwsrf/xcuts.cfm) and the EPA's "Cross-Cutting Federal Authorities: A Handbook on Their Application in the Clean Water and Drinking Water State Revolving Fund Programs" (October 2013: http://www2.epa.gov/sites/production/files/2015-08/documents/crosscutterhandbook.pdf) as of October 12, 2015. This list is subject to change based upon the federal authorities of the EPA. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |