Similar Projects
Main Street Fire Station Replacement Project - City of Lewiston
Demolition, New Construction, Infrastructure
Conception
$4,002,093 CJ est. value
Lewiston, ME 04240

Canal Street Parking Garage Building Repairs - City of Lewiston
Renovation, Infrastructure
Conception
$600,000 CJ est. value
Lewiston, ME 04240

Picker House Lofts
Infrastructure, Renovation
Design
$22,400,000 CJ est. value
Lewiston, ME 04240

Picker House Lofts
Infrastructure, Renovation
Design
$22,400,000 CJ est. value
Lewiston, ME 04240

Lead Abatement-33-35 Bradley St
Term Contract, Renovation, Infrastructure
Bidding
$60,000 CJ est. value
Lewiston, ME 04240

Lead Abatement 116 Horton Street
Term Contract, Infrastructure
Bidding
$40,000 CJ est. value
Lewiston, ME 04240

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Ferry Road Roadway Improvements
Infrastructure
Post-Bid
$430,000 est. value
Lisbon, ME 04250

Statewide Geotechnical Drilling
Infrastructure
Results

On Call Maintenance Paving
Infrastructure
Results

Strawberry Avenue Self-Storage
New Construction, Infrastructure - 28,400 SF
Pending Verification
$3,000,000 CJ est. value
Lewiston, ME 04240

Residence at Great Falls
New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Lewiston, ME 04240

Lewiston Public Works Fueling Station Design and Construction - City of Lewiston
New Construction, Infrastructure
Conception
$2,321,000 CJ est. value
Lewiston, ME 04240

Walgreens - Main Street / Lewiston
New Construction, Infrastructure - 3,834 SF
Design
$825,000 CJ est. value
Lewiston, ME 04240

Hot Mix Shimming and Surface Paving
Infrastructure
Post-Bid
$250,000 est. value
Turner, ME

Last Updated 10/17/2023 07:10 PM
Project Title

2024 Hotel Road Pavement Restoration Project.

Physical Address View project details and contacts
City, State (County) Auburn, ME 04210   (Androscoggin County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $3,200,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The following scope of work is being proposed for the 2024 Hotel Road Pavement Restoration Project for the City of Auburn. The scope of work is a brief overview of the expected extent of work on each street included in this contract. This is only a proposed scope with associated estimated quantities. Items, extent and entire streets may be added or deleted as work progresses or to meet the available funding for this work. The work covered by this section includes furnishing all labor, equipment, materials, incidentals, and the performing of all operations in connection with the work encompassed by these contract documents. All work shall be subject to the terms and conditions of the contract documents. This work shall consist of the removal (milling, grinding or planing) of the surface of the bituminous concrete pavement to the depth, width, grade and cross sections as directed by the Engineer. The sawcut item will be used for cutting the match line in driveways. This work shall include machine placing HMA as indicated in the Scope of Work. Materials and their use shall conform to the requirements of all related and applicable sections of this contract. HMA shall be placed and compacted with a minimum of two lifts where the total thickness of pavement to be placed exceeds 2". The most recently revised special provision Section 108 using the New England Selling Price shall apply to this contract. Hand placed pavement will refer to sidewalks, driveways, and base pavement for pipe trenches. Questions regarding this Request for Bids should be directed to Adam Stevens, Project Manager, at (207) 333-6601, ext. 1140. No proposals will be accepted after the time and date listed. Proposals will be opened at 2:00 p.m. on that date in the Community Room, Auburn City Hall.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents