Similar Projects
Cherokee Logistics Center
New Construction - 214,500 SF
Conception
$10,000,000 CJ est. value
Acworth, GA

Gulfstream Aerospace
New Construction - 202,000 SF
Conception
$55,000,000 est. value
Savannah, GA 31408

Southmeadow - Building 1
New Construction - 227,400 SF
Design
$10,000,000 CJ est. value
East Point, GA

Westlake Building 5900 and 6000
New Construction - 465,950 SF
Design
$10,000,000 CJ est. value
Atlanta, GA

Spartan Nash New Truck Facility
New Construction - 11,274 SF
Bidding by Invitation
Midland, GA 31820

A-Model Self Storage
New Construction - 60,000 SF
Post-Bid
$2,700,000 est. value
Loganville, GA 30052

Office Depot Renovation
Renovation
Post-Bid
Buford, GA

Y--P977 Design Build Combat Vehicle Warehouse, Marine Corps Logistics Base Albany, Georgia
- 200,000 SF
Results
$25,000,000 to $100,000,000 est. value
Albany, GA

Construction Manager Services - Cedar Mountain Road Maintenance Facility
- 15,000 SF
Results
Less than $5,000,000 est. value
Douglasville, GA 30134

Legacy 369 (f/k/a Hobby Storage)
New Construction - 68,860 SF
Construction
$2,000,000 est. value
Cumming, GA 30028

Creekside Industrial Court - Office/Warehouse
New Construction - 10,800 SF
Construction
$550,000 est. value
Lawrenceville, GA 30042

Plummer Road
New Construction - 108,411 SF
Pending Verification
$10,000,000 CJ est. value
Atlanta, GA

Bascomb Carmel Business Center
New Construction - 836,000 SF
Pending Verification
$10,000,000 CJ est. value
Woodstock, GA 30189

Acorn Tree Care - Site Only
New Construction - 5,400 SF
Conception
Cumming, GA 30040

Max Storage f/k/a/ DDR Limited Company
New Construction - 87,500 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Cumming, GA 30506

Last Updated 04/02/2019 10:26 AM
Project Title

Savannah Port Logistics Center - Building 1

Physical Address View project details and contacts
City, State (County) Pooler, GA 31322   (Chatham County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method
Project Status Construction Commenced March 2019
Bids Due View project details and contacts
Estimated Value $30,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description
Details 1 Warehouse/Storage, 1 Story Above Grade, 1,075,200 SF New Construction, 190 Acres.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents