Similar Projects
Remedial Investigations for Per- and Polyfluoroalkyl Substances (PFAS) Impacted Areas at Army Installations in the Northeast Region
Results

Gertz Hall and HAZMAT Removal
Renovation, Alteration
Post-Bid
Queens, NY 11367

IDIQ Biological, Environmental and Cultural Resources Services
Term Contract
Post-Bid

HPEC Building Pool Dehumidification System and Asbestos Abatement
Alteration
Results
$1,800,000 to $1,900,000 est. value
Jamaica, NY 11433

Citywide Abatement Requirements Contract
Alteration
Results
Bronx, Brooklyn, Manhattan, Staten Island, NY

Fuel Oil Tank & Asbestos Abatement
Renovation
Results
Queens, NY 11451

Roof Replacement and Associated Asbestos Abatement
Alteration
Results
Bayside, Queens, NY 11364

Soil Disposal for Four LNA Sites
Alteration
Post-Bid

Academic Core Building Roof Replacement and Associated Asbestos Abatement
Alteration
Results
$18,500,000 to $20,000,000 est. value
Queens, NY 11451

Hazardous Waste Materials Disposal
Alteration
Post-Bid

Soil Disposal At 29 LNA Sites
Term Contract, Alteration
Post-Bid

Soil Disposal At Four (4) LNA Sites
Alteration
Post-Bid

Asbestos/Lead/Mold/PCB Abatement
Term Contract, Infrastructure
Results
$2,486,833 CJ est. value
New York, NY 11101

Asbestos Abatement/Replace Siding
Term Contract, Infrastructure
Post-Bid
$80,000 CJ est. value
New York, NY 11358

PS095Q Early Package / TCU Demolition
Demolition, Infrastructure
Sub-Bidding
$4,000,000 CJ est. value
New York, NY 11432

Last Updated 01/05/2023 04:09 PM
Project Title

Roof Abatement

Physical Address View project details and contacts
City, State (County) New York, NY 11426   (Queens County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Construction start expected July 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $32,759 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Client Number: 09-1440 This project is a two-part project. The roof replacement will be under a separate contract. Awardee will have to coordinate with the awarded roofing vendor. Location- 244-20 Grand Central Pkwy Rosedale, NY 11426 This is an RFQ (request for quotes). This is not an IFB (bid). The Bernard Fineson DDSOO intends to award the contract to the most responsible and responsive vendor that provides the lowest cost and meets the requirements detailed in the scope of work. Upon request, vendor must demonstrate relevant experience on prior projects of similar magnitude and is subject to vendor responsibility determination. Bernard Fineson DDSOO reserves the right to reject any and all quotes. In deciding whether to or not to submit a quote, please be aware the awarded vendor must adhere to the time frames outlined in the scope of work. The awarded vendor will also be required to submit certificates of Liability Insurance and Workers Compensation Insurance as well as completed Lobbying Law Forms, and Signed Appendix A. Please be prepared to submit these in a timely fashion. The Bernard Fineson DDSOO will make no concessions to the vendor for any alleged misunderstanding or deception because of quantity, quality, character, or other condition. The Long Island DDSOOs interpretation of specifications shall be final and binding. Please note all staff working at the project site will be required to sign an attendance sheet for record purposes. This includes the residence visitors log and/or an attendance sheet provided by the maintenance department. NYS Labor law requires that all contracted employees performing maintenance, repairs or capital improvements in state owned buildings receive the prevailing wage and supplements rate for the occupation in which they are working. You may be subject to signing a prevailing wage affidavit. If this is a public work contract covered by Article 8 of the Labor Law or a building service contract covered by Article 9 thereof, neither Contractors employees nor the employees of its subcontractors may be required or permitted to work more than the number of hours or days stated in said statutes, except as otherwise provided in the Labor Law and as set forth in prevailing wage and supplement schedules issued by the State Labor Department. Furthermore, contractor must pay at least the prevailing wage rate or provide the prevailing supplements, including the premium rates for overtime pay, as determined by the State Labor Department in accordance with the Labor Law. NYS law requires the vendor to keep detailed records for each person employed including name, address, telephone number, social security number, occupational classification in which worked, hourly wage rate paid, supplements provided, number of hours worked, and actual wages paid. Certified payroll record/s MUST be submitted at the time of invoicing. Effective April 28, 2008, if this is a public work contract covered by Article 8 of the Labor Law, the contractor understands and agrees that the filing of payrolls in a manner consistent with Subdivision 3-a of Section 220 of the Labor Law shall be a condition precedent to payment by the State of any State approved sums due and owing for work done upon the project. Without submittal of certified payroll record/s, payment will not be made. If you need any assistance understanding prevailing wages, please contact NYS DOL at (212) 932-2419 Subcontracting: OPWDD does not allow subcontracting on this type of work. If you are not licensed to perform abatement services, your quote will not be accepted. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 30% Women Owned Sub-Contracting Goal: 7% Service-Disabled Veteran-Owned Business Contracting Goal: 6% Contract term: 30 days High Priority County(ies): All NYS counties Location: 244-20 Grand Central Pkwy Rosedale NY 11426 Removal of slate shingle abate roof. The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 30 days of award, unless modified below. This is a NYS Public Works project and prevailing wages are to be paid. Refer to attached specification for the following scope of work. Site must be cleaned and all materials secured at the end of each work day. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of removal of slate shingle and ACM containing underlayment before removal of equipment and scaffolding, contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent. * No award. Project will be resolicited as two separate contracts.*

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents