Similar Projects
Pleasant Street Subdivision
New Construction
Conception
Brockton, MA 02301

Residences at Atlantic Country Club and Inclusionary Housing
New Construction, Infrastructure
Conception
$21,877,600 CJ est. value
Plymouth, MA 02360

Keenes Mill Village
New Construction, Infrastructure
Design
$11,000,000 CJ est. value
Duxbury, MA 02332

Sandwich Road/Duplex - Megryco
New Construction, Infrastructure
Design
Plymouth, MA 02360

Underground Condensate Piping Replacement - General Bid
Renovation, Infrastructure
Post-Bid
$2,071,466 CJ est. value
Bridgewater, MA 02324

Statewide Pavement Maintenance at General Aviation Airports in the Commonwealth Including Crack Sealing, Crack Repair, Pavement Repair
Infrastructure
Post-Bid
$3,500,000 est. value

Brockton and Fall River: Fap Structural Steel Cleaning, Painting and Repairs an 2 Bridges Over Route 24
New Construction, Infrastructure
Results
$1,401,834 est. value
Brockton, Fall River, MA

Removal and Replacement of the Pedestrian Bridge at Jenney Pond Park
Renovation, Infrastructure
Results
Plymouth, MA

Middleborough Park Department - Basketball Court Re-Paving
Infrastructure
Construction
$150,000 CJ est. value
Middleborough, MA 02346

Middleborough Park Department - Basketball Court Re-Paving
Infrastructure
Construction
$150,000 CJ est. value
Middleborough, MA 02346

Main Street Battery Storage Warehouse
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Carver, MA 02330

Cushing Street Residential Subdivision
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Hingham, MA 02043

Marion- Wareham- Bridge Replacement, M-05-001=w-06-013 & W-06-016, Wareham Street (Us 6) Over Weweantic River
New Construction, Infrastructure
Conception
$39,323,001 est. value
Marion, MA 02738

School Street Mixed-Use Renovation
Renovation, Infrastructure - 24,000 SF
Design
$5,000,000 CJ est. value
Brockton, MA 02301

Construction Management Services
New Construction, Infrastructure
Post-Bid
$9,200,000 est. value
Bridgewater, MA

Last Updated 07/05/2023 06:05 PM
Project Title

RFP D/B - Bridge Replacement, D-14-010 (48H and 48J), Route 3 (Pilgrim Highway) NB/SB Over Franklin Street

Physical Address View project details and contacts
City, State (County) Duxbury, MA 02332   (Plymouth County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $28,585,478 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Location: Duxbury Project Type: Bridge - Construction Federal Aid No.: HIP(BR)-003S(238)X MASSDOT - Bridge Replacement, D-14-010 (48H & 48J), Route 3 (Pilgrim Highway) NB/SB Over Franklin Street Design-Build

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents