Similar Projects
Lower Frew Levee Setback Design
Infrastructure
Conception
$250,000 CJ est. value
Coles Corner, WA 98826

SR 410/0.75 miles W of East Winter Gate - Culvert Lining
Infrastructure
Conception
$450,000 CJ est. value
Enumclaw, WA 98022

Main Street Place Development
New Construction, Infrastructure - 1,000,000 SF
Design
$380,000,000 CJ est. value
Bellevue, WA 98005

Redmond 87
Demolition, New Construction, Infrastructure - 8,075 SF
Design
$50,000,000 CJ est. value
Redmond, WA 98052

New Transition Services Educational Facility
New Construction, Infrastructure
Post-Bid
$2,500,000 CJ est. value
Bellevue, WA 98004

2nd Avenue Mixed-Use Tower
Demolition, New Construction, Infrastructure
Post-Bid
$45,000,000 CJ est. value
Seattle, WA 98101

Lake to Sound Trail - Segment C SeaTac - Rebid
Infrastructure
Results
$6,857,857 CJ est. value
Seatac, WA 98188

Jan Road Levee Setback
Infrastructure
Results
$9,449,449 CJ est. value
Issaquah, WA 98029

Boren Avenue Office Tower
New Construction, Infrastructure - 282,700 SF
Construction
$56,000,000 CJ est. value
Seattle, WA 98101

The Firs At Talus
New Construction, Infrastructure
Construction
Issaquah, WA 98027

Chapter Buildings
New Construction, Infrastructure - 330,800 SF
Pending Verification
$88,000,000 CJ est. value
Seattle, WA 98105

Olive + Bellevue Mixed Use Development
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Seattle, WA 98122

Herzman Levee Setback Design
Infrastructure
Design
$500,000 CJ est. value
Coles Corner, WA 98826

Eastrail Trail Connection at Spring Boulevard - City of Bellevue
Infrastructure
Post-Bid
$7,500,000 CJ est. value
Bellevue, WA 98005

I-90, SR 161, SR 202 and SR 203 - Fish Passage
Infrastructure
Results
$114,775,595 CJ est. value
Issaquah, WA 98029

Last Updated 08/24/2023 01:19 PM
Project Title

RFP - Affordable Housing Development Proposal

Physical Address View project details and contacts
City, State (County) Kenmore, WA 98028   (King County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected October 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $8,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 24, 2023, information regarding an award for this solicitation is not available. At this time, it is not known if an award has been made or when construction is anticipated to begin. Closed solicitation has been included below for reference. ................. The City of Kenmore is requesting affordable housing development proposals for City-owned property located at 6532 Bothell Way NE in Kenmore, Washington. The mixed-use building to be designed in this proposal will consist of 100% affordable rental units (including some units affordable to households earning no more than 30% AMI) and will incorporate commercial or community space on the building s ground floor. This partnership will result in an equitable, cost efficient, visually appealing and high-quality mixed-use building to be constructed and ready for occupancy by the end of 2026. Affordable housing is the Kenmore City Council s #1 priority, and the City is dedicating more than $5 million of its own resources to this affordable housing development proposal. The City is also leveraging $3 million in funds from A Regional Coalition for Housing (ARCH), for a total combined starting public investment of more than $8 million. The City envisions a building of affordable rental units, with at least 10% of the units, and preferably closer to 20%, designated for those at or below 30% AMI and all of the units for those at or below 80% AMI or at or below the highest AMI recommended in the upcoming market analysis report. In addition, the City envisions a community or commercial use of the ground floor space in the project that will provide a benefit to the community. A few ideas for the ground floor space are included later in this RFP. The City is demonstrating its commitment to affordable housing with this project and is looking for a partner who is equally committed and shares the City s vision of a project to enhance the neighborhood and set a tone for future affordable housing development in and around the City s downtown core. We invite creative and committed partners to submit a proposal and join the City of Kenmore as we work together to add affordable units in Kenmore and do our part to tackle our region s affordable housing crisis. The City of Kenmore is committed to a program of equal employment opportunity regardless of race, color, creed, sex, age, nationality, disability, sexual orientation, or gender identity or expression. The City encourages submittals from firms that demonstrate the same commitment. The method of contractor selection has not been determined at this time. As of March 3, 2022, the due date and time has been confirmed with the owner.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents