Similar Projects
Last Updated | 08/07/2023 10:27 PM |
Project Title | Pavement Maintenance - Countywide |
Physical Address | View project details and contacts |
City, State (County) | Millersville, MD 21108 (Anne Arundel County) |
Category(s) | Single Trades |
Sub-Category(s) | Environmental |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $24,695 [brand] Estimate |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Failure of the Contractor to provide professional pavement maintenance services during the course of this Contract shall be cause for termination of the Contract. A. Crack Sealing Remove vegetation and debris from cracks using an air compressor and wand or motorized crack grazing machine with wire wheel. Surface and hairline cracks less than ¼” wide shall be filled with pavement sealer during the sealer application process. All cracks ¼” or larger shall be dry prior to filling with hot pour crack sealant. B. Crack Sealing Products SealMaster (M1050L) CrackMaster Direct Fire Supreme direct fire hot applied crack sealant or SealMaster (M1075L) CrackMaster Parking Lot Grade oil jacketed hot applied crack sealant shall be used. No substitutions for the specified products shall be accepted. All hot pour crack sealing product shall be heated to between 350° and 380°F. Crack sealant shall fill all cracks and finish flush to the surface. Leave as little hot pour crack sealant on the asphalt surface as possible. Let cure per manufacturer specifications before application of sealcoating. C. Sealcoating 1) SealMaster Polymer Modified MasterSeal (PMM) pre-mixed asphalt base pavement sealer shall be used. No substitutions for the specified product shall be accepted. If necessary, a drying agent may be added to the PMM to accelerate the drying time in cooler temperatures. No other additives shall be added to PMM as the Polymer Additive is blended in during the manufacturing process. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |