Similar Projects
Central Storage Facility RTU Removal
Alteration
Bidding
$24,500 est. value
Dubuque, IA 52001

Periodic Maintenance Inspection on Boilers
Term Contract
Bidding
Davenport, IA 52801

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Bettendorf High School – Dust Collector Replacement
Alteration
Results
Bettendorf, IA 52722

Aquatic Center HVAC Replacement
Alteration
Results
North Liberty, IA 52317

Southwest Valley High School Boiler and Gym Equipment Pre Purchase
Alteration
Bidding
$250,000 est. value
Corning, IA 50841

CSD Indian Hills Junior High School - Boiler Replacement
Alteration
Post-Bid
Less than $425,000 est. value
Clive, IA 50325

Sioux City Convention Center Water Softener Replacement
Alteration
Results
Sioux Center, IA

Replacement of Dust Collection and Roofing Systems
Alteration
Bidding
$385,000 est. value
Cedar Rapids, IA 52402

Camp Dodge S-52 HVAC and Lighting Upgrades
Alteration
Post-Bid
Johnston, IA

Removal and Replacement of Two Air Supply Units
Alteration
Results
$250,000 est. value
Davenport, IA 52801

HVAC Replacement - Estherville Campus
Alteration
Bidding
$70,000 est. value
Estherville, IA 51334

Replacement of 126 Water Heaters
Alteration
Post-Bid
Corning, Creston, Lamoni, Lenox, Leon, Mount Ayr, Osceola, IA

Story County Justice Center HVAC Equipment Replacement Phase 2 and 3
Alteration
Results
Nevada, IA 50201

Last Updated 04/20/2022 04:37 PM
Project Title

Dr Robert Kiser Building Chiller and Pump Replacement

Physical Address View project details and contacts
City, State (County) Sioux City, IA 51106   (Woodbury County)
Category(s) Single Trades
Sub-Category(s) HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $950,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of two air cooled water chillers, chilled water pumps and chilled water piping to the chillers.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents