Similar Projects
Repair Tunnel Waterproofing
Renovation
Post-Bid
$250,000 est. value
Saint Paul, MN

Central City Parallel Tunnel
Post-Bid
MN

Lake Carlos Dam Rock Arch Rapids
Results
$250,000 est. value
Carlos, MN

Shakopee Lake Dam Repair
Renovation
Results
Benson, MN

Soudan Underground Mine Shaft Rehab
Renovation, Alteration
Post-Bid
MN 55782

Farney Creek Dam Repair and Pipe Replacement
Results
MN

Last Updated 08/07/2021 03:04 AM
Project Title

Camden State Park Brawner Dam Rehabilitation

Physical Address View project details and contacts
City, State (County) Russell, MN   (Lyon County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $435,467
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A. The work will be completed under one prime contract. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Erosion and sediment control. 2. Cofferdam and dewatering. 3. Replacement of outlet structure and culvert 4. Construction of emergency overflow spillway. 5. General excavation and grading. 6. Placement of backfill material. 7. Construction of toe drain. 8. Site finishing.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents