Similar Projects
Phase 3 Triple X Streambank Mitigation-Landscape Services
Infrastructure, Alteration
Bidding
OK

Lake McMurtry Nature Learning Trail
Infrastructure
Bidding
Stillwater, OK

Dirt
Post-Bid
Marlow, OK

Fort Gibson Learning Trail
Infrastructure
Post-Bid
Fort Gibson, OK

Bank Protection
Results
Cherokee, OK

Grade, Drain, Surface, and Bridge SH-31: From 1.7 Miles East of the US-270 Junction, Extend Norteast near Krebs
Results
Krebs, OK

Merkle Creek Drainage Improvements
Infrastructure
Post-Bid
Norman, OK 73072

500 Block East Broadway Avenue Box Culvert Replacement
Results
OK

Kendalwood Park North Drainage Improvement Project
Infrastructure
Post-Bid
Glenpool, OK

2200 Block North Cleveland Street Drainage Channel Improvement
Results
Enid, OK 73703

Sand Springs Franklin Creek Channel Improvement at Case Park Soccer Complex
Infrastructure
Post-Bid
Sand Springs, OK

Drainage Improvements to Super Span I-44 and Classen Boulevard
Infrastructure
Results
Oklahoma City, OK

Grade, Drain, Surface, and Bridge
New Construction, Infrastructure
Results
Okemah, OK 74859

Grade, Drain, and Surface
Infrastructure
Results
OK

2021 Detention Pond Rehabilitation
Infrastructure
Results
Edmond, OK

Last Updated 09/20/2021 08:53 AM
Project Title

112th Street Culvert Improvements Project

Physical Address View project details and contacts
City, State (County) Jenks, OK   (Tulsa County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Said construction shall be to place three (3) 36-inch pipes under 112th Street, two concrete end sections and an asphalt patch over the disturbed pavement. An estimated 120 linear feet of 36-inch HP-Storm pipe and 140 square yards of asphalt pavement will need to be constructed. Traffic control and scheduling limits of no access to streets will be based on door-to-door notification of affected residents at least 72 hours in advance. This project includes all associated appurtenances, labor, materials, equipment, supplies, services and related items in the specification and as designed.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents