Similar Projects
Flint River Outfall Replacement - Phase 4
Infrastructure
Bidding
Riverdale, GA 30274

FY 2019 CDBG for Flooding, Street and Drainage System Improvements
Infrastructure
Bidding
$530,000 est. value
GA

Beechwood Circle Drainage Replacement
Post-Bid
Lawrenceville, GA 30046

Dressler Ditch Improvements
Post-Bid
Rincon, GA 31326

Holly Court Drainage Repairs
Results
Acworth, GA 30101

First Street Resurfacing, Street, Water Extension
Results
Richmond Hill, GA 31324

Oak Grove Cemetery Drainage Improvement Project
Infrastructure
Bidding
Saint Marys, GA 31558

Crossgate Subdivision Drainage Improvements
Post-Bid
Guyton, GA 31312

Driveway Culvert Replacement and Ditch Re-Grading - Richmond Heights Subdivision
Results
Richmond Hill, GA

Highway 32 Sidewalk and Drainage Improvement Project
Infrastructure
Bidding
Nicholls, GA 31554

CDBG Engineering Services
Post-Bid
Alma, GA

North Fork Nancy Creek Stream Restoration Project
Results
Brookhaven, GA 30319

Storm Drainage and Street Improvements
Infrastructure
Bidding
Ellenton, GA

Grayland Hills Drive Drainage
Post-Bid
Lawrenceville, GA 30046

Pike County CDBG19 - Storm Drainage and Street Improvements, Hill Top Community
Results
Less than $515,000 est. value
Zebulon, GA 30295

Last Updated 02/15/2022 01:49 PM
Project Title

Lake Douglas Culvert

Physical Address View project details and contacts
City, State (County) Bainbridge, GA   (Decatur County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: South Side: Form and pour wing wall on each side and (2) head wall on each side. Spill slab on each side at bottom of pipe. Walls 8” thick with 4000 PSI concrete with 5/8” rebar tied at 4’ verticals and 18” tied on the horizontal. South side one wing wall, approximately 8’x4’x8”. The head wall approximately 2’ x 16’ x 8” with 5/8” rebar. North Side: (2) wing wall 8’x4’x8” with 5/8” rebar tied in it. Head wall 2’x16’x8”. Spill way slab approximately 7’x20’x4” with fiber mesh. All concrete will be 4000 PSI.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents