Similar Projects
Transformers
Post-Bid
Greenville, NC 1907624

Testing and Repair of Hydroelectric Generator Governor Systems at Hydroelectric Facilities for the U.S. Army Corps of Engineers
Post-Bid

Southside Pump Station Screening Structure Electrical Wireway Replacement
Results
Greenville, NC 27835

Pad Mounted Electrical Switchgear
Results
Less than $50,791 est. value
Greenville, NC

Electrical Services
Term Contract
Post-Bid
Greenville, NC 27835

Cree LED Lighting Fixtures
Results
Less than $271,358 est. value
Greenville, NC 27858

Eaton Uninterrupted Power Supply System
Post-Bid
Greenville, NC 27858

Cable
Results
Greenville, NC 27834

Sugg Parkway Substation Structures, Equipment, and Foundation Design
Results
Greenville, NC 27834

Greenville Lighting
Results
Less than $8,880 est. value
Greenville, NC 27834

Transformers
Results
Greenville, NC 27834

Furnishing of 15.5 KV Power Circuit Breakers
Results
Greenville, NC 27834

Cable
Results
Greenville, NC 27834

Two (2) 20 Mva, 115 To 13.2Y/7.62 Kv Power Transformer With Load Tap Changer for Sugg Parkway and Spare
Results
Greenville, NC 27834

Transformers
Results
Greenville, NC

Last Updated 12/08/2020 05:21 AM
Project Title

Installation of 115 KV Transmission Structures Along SUGG Parkway Tap

Physical Address View project details and contacts
City, State (County) Greenville, NC 27834   (Pitt County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Covers the removal, installation, and materials of 5 transmission structures along Greenville Utilities’ Circuit 15, 115kV transmission line and the installation of 21 transmission structures along Sugg Parkway Tap, 115 kV transmission line. The 5 existing wooden transmission structures along Circuit 15 will be replaced with new steel structures. The existing conductors will not be replaced. There will be 5 spans of 795 AAC distribution conductor removed along Circuit 15 transmission structures. All hardware and insulators will be replaced. The construction of the new Sugg Parkway Tap includes 21 Transmission structures with distribution underbuild. New conductors will be installed for transmission and distribution. Fiber and telecommunication transfers should also be included. The proposal submitted by the contractor shall include all labor, equipment, and all other necessary items to complete this project. The Circuit 15 115 kV transmission line consists of approximately 0.2 miles of 1272 AAC with 7#9 Alumoweld OHGW. Circuit 15 also includes approximately 0.2 miles of existing 12.47 kV distribution double circuit under build consisting of 795 AAC for all phases and a 336 ACSR neutral. The Sugg Parkway Tap, 115 kV transmission line consists of approximately one (1) mile of 1272 AAC with 7#9 Alumoweld OHGW. The Sugg Parkway Tap also includes approximately one (1) mile of 12.47 kV Distribution under build consisting of 795 AAC and a 336 ACSR neutral.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents