Similar Projects
Terminal Way Grade Separation - Los Angeles County Metropolitan Transportation Authority
Infrastructure
Conception
$999,000,000 est. value
Los Angeles, CA 90012

San Pedro Waterfront Access - Los Angeles County Metropolitan Transportation Authority
Infrastructure
Conception
$9,000,000 est. value
San Pedro, CA 90731

Runway 26R ILS Upgrade Project at Ontario Internatonal Airport
Infrastructure
Bidding
$3,250,000 est. value
Ontario, CA 91761

South Apron Concrete Repair
Term Contract
Post-Bid
$1,000,000 to $3,000,000 est. value
CA 95903

Rubber Removal and 900 Ramp Restriping
Alteration
Post-Bid
Travis AFB, CA

Modesto Junior College East Campus Track Runways Relocation
Infrastructure
Results
$675,000 est. value
Modesto, CA 95350

PW Various Locations Pavement Renovation No 45 and Sewer Replacement
Infrastructure, Alteration
Results
$6,300,000 est. value
San Francisco, CA 94103

Alameda Corridor Terminus Enhancements - Los Angeles County Metropolitan Transportation Authority
New Construction, Infrastructure
Conception
$999,000,000 est. value
Compton, CA 90222

SJC New Taxiway Victor Phase 1
Infrastructure
Post-Bid
$22,000,000 est. value
San Jose, CA

Runway 20 Displaced Threshold at Santa Maria Public Airport
Demolition
Results
Santa Maria, CA 93455

Fire Retardant Pit and Taxiway Renovations
Alteration
Post-Bid
$10,000,000 to $25,000,000 est. value
Redding, CA

Airport Way Resurfacing
Infrastructure
Results
$570,000 to $697,000 est. value
French Camp, CA

Taxiway A Pavement Rehabilitation Project
Infrastructure
Post-Bid
Sonoma, CA

Apron Reconstruction at Reedley Municipal Airport
Alteration
Results
Reedley, CA 93654

Sacramento International Airport Paving Economy Lot Rows 42A-42M
Infrastructure
Post-Bid
$3,800,000 est. value
Sacramento, CA 95837

Last Updated 06/17/2022 08:42 AM
Project Title

SR-47/Navy Way Interchange - Los Angeles County Metropolitan Transportation Authority

Physical Address View project details and contacts
City, State (County) Los Angeles, CA 90731   (Los Angeles County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Design Development, Construction Start Expected February 2023, Construction Completion Expected February 2028
Bids Due View project details and contacts
Estimated Value $99,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Improves traffic operations/safety on SR-47 between Vincent Thomas Bridge and Gerald Desmond Bridge. As of June 16, 2022, this project is currently in the design stage. If this project becomes fully funded, it can be completed and in operation by 2028 for the Olympic Games. Information regarding a design team and a general contractor is not available. A firm construction start date has not been determined. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *This project is included in the initial compilation of projects for consideration in Metro's Mobility Concept Plan in relation to the 2028 Olympics. This list has not been reviewed by the Games Mobility Executives. This project will continue to be updated as further information becomes available.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents