Similar Projects
Water Reclamation Facility Expansion
Addition
Design
Clermont, FL

Wastewater Treatment Plant No. 2 Expansion
Addition
Design
Palm Coast, FL

Mid-County Waste Water Treatment Plant Headworks
New Construction
Bidding
$5,000,000 est. value
Dunedin, FL 34698

Meadowlake Water Treatment Plant Expansion
Bidding
Less than $1,686,000 est. value
Green Cove Springs, FL 32043

Design Build Services Cosme WTP Operational and SCADA Improvements
Post-Bid
$30,000,000 est. value
Saint Petersburg, FL 33731

Bradenton Water Treatment Plant (WTP) Drying Lagoon
Post-Bid
Bradenton, FL 34203

Tindall Hammock Irrigation and Soil Conservation District Water Treatment Plant Improvements Phase 2
Term Contract
Results
Less than $572,000 est. value
Davie, FL 33314

HFC AWTP Master Plan Improvements, Phase I Design-Build
Results
Less than $254,000,000 est. value
Tampa, FL 33602

CR 136 / I-75 Water Treatment Plant
Construction
FL

Packing District Park - Master Lift Station Upgrades
Renovation
Construction
Orlando, FL 32869

Southern Region Water Reclamation Facility Process Improvements
Renovation, Addition
Design
$17,500,000 to $22,500,000 est. value
Boynton Beach, FL 33437

Spring Lake Improvement District WTP Two Improvements Cas Project
New Construction
Bidding
Sebring, FL

J046--Fy20: RFI Water Treatment Boiler and Chiller
Post-Bid
Tampa, FL 33612

Design-Build Services for DLTWTF Master Plan Improvements
Results
Less than $300,000,000 est. value
Tampa, FL 33600

Spring Lake Improvement District WTP One Improvements CAS Project
New Construction
Bidding
Sebring, FL

Last Updated 10/08/2021 11:16 AM
Project Title

Wastewater Treatment Plant and Associated Appurtenances

Physical Address View project details and contacts
City, State (County) FL   (Columbia County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Design Development, Bidding Expected first quarter 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Design and permit a 500,000 gallons per day field-erected wastewater package treatment facility to be located in the North Florida Mega Industrial Park and to include effluent disposal, water reuse and connection to the City of Lake City utility system. Build a wastewater treatment plant (WWTP) that will serve the North Central Florida Rural Area of Opportunity’s 500-acre Catalyst Site, the North Florida Mega Industrial Park and economic development target area in eastern Columbia County, including the Lake City Gateway Airport and Florida Gateway College. The WWTP should start treating 500,000 gallons of water per day and increase in capacity in 250,000 gallon increments to meet the demands of new industry. The WWTP will be connected to the existing wastewater collections system owned by the City of Lake City and the City will divert flow of their collections system to the new WWTP to create additional treatment capacity for economic development projects outside of the North Florida Mega Industrial Park, allowing the facility to be operational and functional from the day of completion and enabling existing business to expand. The North Florida Mega Industrial Park (NFMIP) is a public/private partnership project owned by Weyerhaeuser. Weyerhaeuser has identified a potential 20 acre site within the North Florida Mega Industrial Park and will provide the land for the WWTP based upon the design of the plant.

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents