Similar Projects
RFQ - ADA Compliance for Various Kansas City Water Buildings
Term Contract
Conception
Kansas City, MO 64106

Grit Removal Improvements - Rock Creek Pump Station - 302401 - City of Independence
Renovation
Conception
$977,500 CJ est. value
Independence, MO 64050

Disinfection Wastewater Treatment Plant - City of Kirksville
Renovation
Design
$1,100,000 CJ est. value
Kirksville, MO 63501

Pineville Water System Improvements
Renovation, Infrastructure
Bidding
$500,000 CJ est. value
Pineville, MO 64856

Wastewater System Improvements
Renovation
Post-Bid
$1,600,000 est. value
Greenfield, MO

WWTP Snail Removal Structure Renovation
Renovation
Post-Bid
$360,000 est. value
Monett, MO

Missouri River WWTF Digester Gas Storage Cover Replacement
Renovation
Results
$1,624,000 est. value
Saint Louis, MO

Wastewater Treatment Plant Improvements
Renovation
Results
Lone Jack, MO

Wastewater Treatment Facility Headworks Repairs - 2022
Infrastructure
Construction
$276,467 CJ est. value
Kansas City, MO 64152

2021 Bond - City of Warrenton
Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Warrenton, MO 63383

Nutrient Removal - Rock Creek Treatment Plant - 302502 - City of Independence
Renovation
Conception
$3,000,000 CJ est. value
Independence, MO 64053

Wastewater Treatment Plant Improvements at the Business and Technology Park
New Construction
Post-Bid
$7,002,000 est. value
Sikeston, MO

Hickory Trails WWTF Upgrades
Renovation
Results
MO

Wastewater Treatment Plant Repair Project
Renovation
Post-Bid
$3,000,000 est. value
Boonville, MO

WWTF Clarifier Replacement
Renovation
Results
Steelville, MO

Last Updated 07/18/2023 10:19 AM
Project Title

Orb Gate Replacement

Physical Address View project details and contacts
City, State (County) Belton, MO 64012   (Cass County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $105,400 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Replacing the Orb Gates at the City of Belton Wastewater Treatment Facility. The Orb Gates shall be 96 wide and 48 tall. The distance from Invert of Opening to Operating Floor shall be 4. The outer gate shall be replaced first. The specific locations of the work to be done shall be contained in the special provisions section of the bid document. The Contractor shall bid on all work. All equipment, materials, and workmanship must be in accordance with the Specifications and other Contract Documents. Due to the importance of all bidders having a clear understanding of the specifications and scope of work requirements, bids will only be accepted from those who are represented at one of the Pre-Bid Meetings. Attendance at the Pre-Bid Meeting will be evidenced by the representative's signature on the attendance roster. Replacing the Orb Gates at the City of Belton Wastewater Treatment Facility. The Orb Gates shall be 96" wide and 48" tall. The distance from Invert of Opening to Operating Floor shall be 4'. The outer gate shall be replaced first. Requests for information related to this RFP should be directed to: Andrew Niiro, Engineer I Telephone: (816) 892-1293 E-Mail: aniiro@belton.org

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents