Similar Projects
EV Charging Stations
Renovation
Design
$300,000 CJ est. value
Brentwood, NH 03833

Northern Correctional Facility Millwork and Door Controller
Renovation
Post-Bid
$100,000 CJ est. value
Berlin, NH 03570

Repaving Corrections Recreation Yard
Infrastructure
Bidding
$200,000 CJ est. value
Laconia, NH 03246

Last Updated 08/30/2022 01:04 AM
Project Title

Concord

Physical Address View project details and contacts
City, State (County) Concord, NH 03301   (Merrimack County)
Category(s) Government/Public
Sub-Category(s) Prison/Jail
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $2,400,000 [brand] Estimate
Plans Available from Civil Engineer - 08/04/22
Owner View project details and contacts
Architect View project details and contacts
Description

Replace Steam Lines and Traps Description: Work to include but not be limited to: Remove existing steam lines, traps and valves. Replace with new steam lines, traps and valves. The Project will include the Discipline(s) of: Mechanical and Electrical. Bidders Should Act Promptly and Submit All Questions in Writing to David W. Goulet, Fax 603/271-3515, E-mail David.goulet@das.nh.gov in Accordance With "explanation to Bidders". Security Clearances Are Required for Each Person Attending the Pre-bid Conference. Background Check Form Attached to Specification Section 000250 Must Be Submitted to the Department of Corrections Jason.m.newton@doc.nh.goyv and Heidi.h.laramie@doc.nh.gov for Each Person Attending at Least 3 Days Prior to Walkthrough. Approval is Not Guaranteed. Those Not Approved Will Not Be Allowed to Enter the Secure Facility. Approved Persons Will Be Notified. No Notification Indicates No Approval. A bid bond shall be submitted electronically at the time of bid in the amount listed below, payable to, 3 Treasurer, State of New Hampshire, as security for the execution of the contract. e All individuals, firms, partnerships or corporations intending to bid, before obtaining plans and specifications, must file with the Department of Transportation on forms prepared for that purpose at least ten (10) days prior to opening of bids, a statement showing their qualifications. No valid bidding proposal will be issued to a prospective bidder who is not qualified. Companies, Corporations or Trade Names, Except Sole Proprietorships Must Be Registered With the Secretary of E State (Corporate Division, Telephone No. 603/271-3244) in Order to Do Business With the State of New Hampshire. Bidders are advised that final bid award, as approved by Governor and Executive Council, and issuance of a notification to proceed with the work, can occur up to 60 days or more after the bid opening date. Per section 00204.18.2, Low Bidder has 20 days after notice of award to submit signed Contract, Certificate of Insurance, and Disadvantage Business Enterprise forms, if required. Bidders must submit a 5% bid security at Bid and must furnish a 100% payment and performance security prior to execution of contract. The right is reserved to waive any informalities in or to reject any or all proposals. NH DOT - Concord

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents