Reported | 11/22/2019 12:00 AM |
Project Title | Design and Construct a Splash Pad at Oakwood City Park |
Physical Address | View project details and contacts |
City, State (County) | Oakwood, GA (Hall County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Park/Playground |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFP) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The proposed splash pad will be built at the existing pool City in the Oakwood City Park located at 4114 Walnut St, Oakwood, GA 30566. The available space for the installed project is approximately 2,500-3,000 square feet. The successful firm will be required to coordinate with the City Public Works Director. The below specification describes the components of the desired complete splash pad equipment system. The system should include, but is not limited to, those components necessary to make up a completely operational system. The splash pad system is designed to operate as a water treatment recirculation system. The splash pad includes the concrete slab, interactive play features, ground nozzles, internal plumbing and electrical works, computerized control system and activators, and other items specified below. 1. All surfacing shall be installed so that the entire project complies with the Americans with Disabilities Act (ADA) guidelines established by the Architectural and Transportation Barriers Compliance Board. 2. The system will be located within the footprint of the city pool. The intent is to operate the splash pad during warm weather months. 3. The control system will also allow future operation of different groups of features and/or individual features, in varying configurations, sequencing, activating individual features, and provide time of schedule. An above ground feature controller may be itemized separately. The controller must control the operational variation patterns to be determined by the City. The controller must operate the solenoid valves to change spray values of individual interactive spray features and have accessible on-site control. 4. The splash pad equipment (spray features, embed sprays, drains, pumps, filtration, controls, manifold, and sensors) will be furnished and installed under this contract. The Splash Pad equipment manufacturer will coordinate the delivery of the equipment to accommodate the installing contractor installation schedule. If the Splash Pad equipment is ready prior to the installing contractors required delivery, the splash pad equipment manufacturer or contractor will make arrangements to store the equipment. 5. All electrical equipment, wiring and conduit necessary for full operation of the splash pad. 6. Any other necessary specialties required for proper installation of the splash pad and related equipment resulting in a complete and useable splash pad. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |