Similar Projects
Savannah Harbor - Master Plan
New Construction
Conception
$400,000,000 est. value
Savannah, GA 31421

Savannah Harbor - Infrastructure - Phase I
New Construction
Conception
$130,000,000 est. value
Savannah, GA 31421

InIine Communities
New Construction
Design
Conyers, GA 30013

Swings and Shade Structures for Grovetown Elementary
Term Contract
Post-Bid
Less than $30,000 est. value
Grovetown, GA 30813

Colonial Hills Unity Park Phase 1 Renovations
Post-Bid
East Point, GA 30344

Main Street Park Playground
Results
Dawsonville, GA

Design Build Services for School Track, Field and Associated Improvements
Term Contract
Results
Atlanta, GA

New Beginning Early Learning Academy
New Construction, Demolition - 4,500 SF
Construction
$500,000 est. value
Albany, GA 31700

Johnson Park Gymnasium Renovations
Construction
Conyers, GA

Wire Park - Phase I
New Construction, Renovation - 199,480 SF
Conception
Watkinsville, GA 30677

Union County Primary School, Union County Elementary School, and Woody Gap School Playground Equipment
Post-Bid
Blairsville, GA 30512

Half Basketball Court
Results
Aragon, GA 30104

New Water Park Design/Build Services for Clayton County International Park
Construction
Hampton, GA 30228

Nelson Worldwide Mixed Use
New Construction
Conception
Suwanee, GA 30024

Handicap Accessible Swings for Parkway Elementary
Post-Bid
Less than $15,000 est. value
Evans, GA 30809

Reported 11/22/2019 12:00 AM
Project Title

Design and Construct a Splash Pad at Oakwood City Park

Physical Address View project details and contacts
City, State (County) Oakwood, GA   (Hall County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed splash pad will be built at the existing pool City in the Oakwood City Park located at 4114 Walnut St, Oakwood, GA 30566. The available space for the installed project is approximately 2,500-3,000 square feet. The successful firm will be required to coordinate with the City Public Works Director. The below specification describes the components of the desired complete splash pad equipment system. The system should include, but is not limited to, those components necessary to make up a completely operational system. The splash pad system is designed to operate as a water treatment recirculation system. The splash pad includes the concrete slab, interactive play features, ground nozzles, internal plumbing and electrical works, computerized control system and activators, and other items specified below. 1. All surfacing shall be installed so that the entire project complies with the Americans with Disabilities Act (ADA) guidelines established by the Architectural and Transportation Barriers Compliance Board. 2. The system will be located within the footprint of the city pool. The intent is to operate the splash pad during warm weather months. 3. The control system will also allow future operation of different groups of features and/or individual features, in varying configurations, sequencing, activating individual features, and provide time of schedule. An above ground feature controller may be itemized separately. The controller must control the operational variation patterns to be determined by the City. The controller must operate the solenoid valves to change spray values of individual interactive spray features and have accessible on-site control. 4. The splash pad equipment (spray features, embed sprays, drains, pumps, filtration, controls, manifold, and sensors) will be furnished and installed under this contract. The Splash Pad equipment manufacturer will coordinate the delivery of the equipment to accommodate the installing contractor installation schedule. If the Splash Pad equipment is ready prior to the installing contractors required delivery, the splash pad equipment manufacturer or contractor will make arrangements to store the equipment. 5. All electrical equipment, wiring and conduit necessary for full operation of the splash pad. 6. Any other necessary specialties required for proper installation of the splash pad and related equipment resulting in a complete and useable splash pad.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents