Similar Projects
RFP - Stream Restoration at Forty Acre Hp
Infrastructure
Conception
$250,000 CJ est. value
Columbia, SC 29201

S-10 (Harden St) - Bike/Ped Safety Project/RSA
Infrastructure
Conception
$750,000 CJ est. value
Columbia, SC 29204

Shady Lane Force Main Replacement (SS7548) CDBE - Part 1
Infrastructure
Design
$661,770 CJ est. value
Columbia, SC 29206

Crane Creek 02 and 04 SSES and Rehabilitation Implementation
Infrastructure
Design
$700,000 CJ est. value
Columbia, SC 29201

Mcentire Jngb Rnwy 14-32 Pavement Repair
Infrastructure
Post-Bid
Eastover, SC 29044

Jackson Creek Site Restoration Project
Infrastructure
Post-Bid
Columbia, SC 29206

Carolina Crossroads Phase 2 - Broad River Road at I-20 Interchange
Results
SC

Columbia High School Baseball and Softball Field Press Box
Addition - 134 SF
Results
Columbia, SC 29210

Freed Street Deck
New Construction
Construction
Columbia, SC 29201

Gadsen Place
Renovation - 17,000 SF
Construction
Columbia, SC

Lexington County Health Ambulatory Surgical Facility
New Construction, Infrastructure
Pending Verification
$19,894,166 CJ est. value
Columbia, SC 29229

Broadstep Academy Ferry Road Residential Treatment Facility / Eastover
New Construction, Infrastructure
Pending Verification
$649,580 CJ est. value
Eastover, SC 29044

Metro Wastewater Treatment Plant Flow Metering Improvements CDBE - Part 1
Renovation, Infrastructure
Design
$600,000 CJ est. value
Columbia, SC 29201

Midlands - Parking Lot Repairs - Beltline Campus
Infrastructure
Post-Bid
$150,000 to $180,000 est. value
Columbia, SC 29205

Gleamns Head Start Driveway Expansions
Results
$250,000 to $400,000 est. value
SC 29210

Last Updated 10/20/2022 05:02 PM
Project Title

Burnside Farms Apartments

Physical Address View project details and contacts
City, State (County) Columbia, SC 29209   (Richland County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Park/Playground, Parking Garage, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Swimming Pool(s)
Contracting Method Bids by Invitation
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $30,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 20, 2022, the General Contractor is selected. Timeframe for construction is unconfirmed* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

5 Stories Above Grade, 293,058 SF. Parking Spaces, 544 Parking Spaces.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Underwater Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Selective Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents