Misc. Structures, Site Development Construction Project Lead, Arlington, VA 22202 (Arlington County)
Last Updated | 12/18/2023 11:34 AM |
Project Title | Crystal City Metro Station East Entrance |
Physical Address | View project details and contacts |
City, State (County) | Arlington, VA 22202 (Arlington County) |
Category(s) | Heavy and Highway, Transportation |
Sub-Category(s) | Misc. Structures, Site Development |
Contracting Method | Bids by Invitation |
Project Status | Contract Award, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $90,765,000 [brand] Estimate |
Plans Available from | Consultant |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project will design and construct a second entrance to the Crystal City Metrorail Station at the northwest corner of the intersection of Crystal Drive and 18th Street South. The new entrance will be located to the east of the existing entrance, which is located on south Bell Street at 18th Street South, and will provide access to the east side of the train platform. The new entrance will include two street-level elevators and stairs connecting to the fare payment area and an underground passageway and new mezzanine with stairs and elevators to the train platform. The new entrance will have fare gates, fare vending machines, and an attended kiosk. This new entrance will provide more direct access to businesses and residences on the east side of Crystal City, and will better connect to the Virginia Railway Express (VRE) Crystal City station, served by the VREs Manassas and Fredericksburg Lines; the northbound Metroway service originating in Alexandria; and the ART 43, which provides direct, limited-stop service to the Rosslyn-Ballston Corridor. As of June 3, 2021, design is underway. The engineering and design process kicked off in September 2020, and the 30% design phase is anticipated to be complete in summer 2021. Key elements of this phase of the project include topographical survey, environmental analysis, preliminary station design, and community stakeholder coordination. A timeline for construction has not been announced. Arlington County reserves the right to reject any and all proposals, cancel this solicitation, and waive any informalities as defined in the Arlington County Purchasing Resolution Question Date 18 July 2023 5 PM |
||||||||||||||||||
Details |
|
||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |