Similar Projects
Renovate Sports Arena Ice Rink Refrigeration System at Buffalo State College
Alteration
Bidding
Buffalo, NY 14222

Replace Various Air Handling Units and Controls at Bacon Hall at Buffalo State
Alteration
Bidding
Buffalo, NY 14222

On Call HVAC Services
Term Contract
Post-Bid
Buffalo, NY 14202

HVAC/Refrigeration Replacement & Maintenance
Term Contract
Post-Bid

HVAC Rooftop Replacement
Results
Buffalo, NY 14203

Kitchen Exhaust Hoods and Exhaust Fan Cleaning and Inspection
Term Contract
Results
Cheektowaga, Tonawanda, West Seneca, NY 14224

Lockwood Library - Chilled Water Upgrades at Building Entrance
Alteration
Bidding
Buffalo, NY 14228

Hamburg Palace Theatre - Roof & 2nd Floor HVAC
Renovation - 4,470 SF
Post-Bid
$182,000 est. value
Hamburg, NY 14075

Heating, Ventilating and Air Conditioning Service and Preventive Maintenance Work
Term Contract
Results
Cheektowaga, NY 14227

Cooke Hall - Chilled Water Upgrades at Building Entrance
Alteration
Bidding
Buffalo, NY 14260

Inspections and Minor Repairs of AES Systems
Post-Bid
Buffalo, NY 14202

HVAC Systems- Maintenance and Repair
Term Contract
Results
Buffalo, Orchard Park, Williamsville, NY 14203

Furnas Hall - Chilled Water Upgrades at Building Entrance
Alteration
Bidding
Buffalo, NY 14260

Filters
Post-Bid
NY

Town Wide HVAC
Results
Williamsville, NY 14221

Last Updated 12/14/2021 09:15 AM
Project Title

UVGI System Installation

Physical Address View project details and contacts
City, State (County) Buffalo, NY 14203   (Erie County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Vendor to provide and install a UVGI system at Erie County Public Safety Building, 45 Elm Street, Buffalo, NY 14203. Furnish and install UVGI system retrofitted into AHU-1 thru AHU-6 at the Public Safety Building @ 45 Elm St. Buffalo, NY 14203. The system installed shall provide improved HVAC hygiene and a quantifiable mitigation of airborne spread of infectious or disease-causing agents. Each system shall be designed to inactivate Influenza A virus >99% in the designed airflow on a single pass for the life expectancy of the UV-C lamps. UV-C lamps shall be designed to provide sufficient UV-C irradiation to achieve specified results for two (2) years of continuous operations (approximately 18,000 hrs.).

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Anti-Microbial Ultraviolet Emitters for HVAC Ducts and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents