Similar Projects
RR Grade Separation, CE
Infrastructure
Conception
$10,000,000 CJ est. value
Sioux Falls, SD 57107

Interchange Reconstruction
Infrastructure
Conception
$44,458,000 CJ est. value
Sioux Falls, SD 57103

LSDC Overlay, Approach Slabs, Approach Pavement, Approach Guardrail
Infrastructure
Conception
$4,001,000 CJ est. value
Renner, SD 57055

Grading, Storm Sewer, Curb and Gutter, PCC Surfacing, Str Widening, Signals, Lighting
Infrastructure
Conception
$21,659,000 CJ est. value
Sioux Falls, SD 57106

Grading, PCC Surfacing, Curb and Gutter, Sidewalk, Lighting
Infrastructure
Conception
$9,539,000 CJ est. value
Egan, SD 57024

Modify Crossovers
Infrastructure
Conception
$4,481,000 CJ est. value
Sioux Falls, SD 57103

Shoulder Widening, Pipe Work, Spot Grading; Replace Str (RCBC), Approach Grading
Infrastructure
Conception
$23,015,000 CJ est. value
Rapid City, SD 57702

Deck Replacement, Approach Slabs, Rehab Abutments, Bridge Painting
Infrastructure
Conception
$1,846,000 CJ est. value
Sioux Falls, SD 57107

Modify Ramp - NB On Ramp; LSDC Overlay, Approach Slabs, Approach Pavement, Replace Steel Pedestrain Rail
Infrastructure
Conception
$2,190,000 CJ est. value
Sioux Falls, SD 57103

Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$1,114,000 CJ est. value
Harrold, SD 57536

Mill, AC Resurfacing
Infrastructure
Conception
$4,014,000 CJ est. value
Olivet, SD 57052

Upgrade Signals, Crossing Surface Rehabilitation, Approach, PE, CE
Infrastructure
Conception
$1,000,000 CJ est. value
Valley Springs, SD 57068

Grading, Interchange Reconstruction, PCC Surfacing
Infrastructure
Conception
$33,216,000 CJ est. value
New Underwood, SD 57761

Mill and AC Resurfacing, Pipe Work
Infrastructure
Conception
$12,284,000 CJ est. value
Faulkton, SD 57438

Replace Str Bridge, Approach Grading, PCC Surfacing, Concrete Barrier, Approach Slabs, Guardrail, Lighting
Demolition, New Construction, Infrastructure
Conception
$6,084,000 CJ est. value
Rapid City, SD 57701

Last Updated 11/01/2022 03:07 PM
Project Title

Lake Mitchell Dredging - City of Mitchell

Physical Address View project details and contacts
City, State (County) Mitchell, SD 57301   (Davison County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $15,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A more detailed scope is expected to be released on a future date. As of November 1, 2022, this project is in the design phase. An engineer has been selected for the project. Although a firm timeline has not been established, construction is estimated to take place in fall of 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents