Similar Projects
Last Updated | 10/18/2021 02:53 AM |
Project Title | Surface Treatment |
Physical Address | View project details and contacts |
City, State (County) | CO (Moffat County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $5,000,000 to $20,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This Is A Surface Treatment Project Within Moffat County, Along Us 40, With Project Limits Beginning At Approximate Mp 79.7 And Continuning Easterly For 13 Miles To Approximate Mp 93.0, Through The Town Of Craig, Co, And Also Include The Us 40 Frontage Road On The West End Of Craig, Co, And Sh 13 Yampa Ave Between 4th And 6th Street. The Surface Treatement Limits Begin At Approximate Mp 80.7 And Continue Easterly For 11.3 Miles To Approximate Mp 92.0. The Work Includes The Placement Of A 2.0" Overlay, A 2.0" Mill And Fill Overlay, And A 2.5" Mill And Fill Overlay. The Work Also Includes Signal Replacement At Us 40 And Green Street, Ada Curb Ramp Replacement, Guardrail Replacement, Pavement Marking, Rumble Strips, And Traffic Control. 202-00203 Removal Of Curb And Gutter 1,293.000 Lf 202-00240 Removal Of Asphalt Mat (Planing) 171,974.000 Sy 202-00250 Removal Of Pavement Marking 74,424.000 Sf 202-00828 Removal Of Traffic Signal Equipment 1.000 L S 203-00000 Unclassified Excavation 362.000 Cy 203-01597 Potholing 120.000 Hour 210-04010 Adjust Manhole 21.000 Each 210-04050 Adjust Valve Box 30.000 Each 304-01000 Aggregate Base Course (Class 1) 211.000 Ton 304-06000 Aggregate Base Course (Class 6) 2,711.000 Ton 403-34701 Hot Mix Asphalt (Grading Sx) (75) 44,798.000 Ton 411-03342 Asphalt Cement Performance Grade (Pg 64-28) 1,095.000 Ton 411-03355 Asphalt Cement Performance Grade (Pg 58-34) 1,593.000 Ton 411-10255 Emulsified Asphalt (Slow-Setting) 40,567.000 Gal 503-00018 Drilled Shaft (18 Inch) 15.000 Lf 503-00048 Drilled Shaft (48 Inch) 42.000 Lf 608-00006 Concrete Sidewalk (6 Inch) 98.000 Sy 609-21020 Curb And Gutter Type 2 (Section Ii-B) 1,279.000 Lf 613-00206 2 Inch Electrical Conduit (Bored) 550.000 Lf 613-00306 3 Inch Electrical Conduit (Bored) 1,200.000 Lf 613-07000 Pull Box (Special) 6.000 Each 613-10000 Wiring 1.000 L S 614-70336 Traffic Signal Face (12-12-12) 15.000 Each 614-70560 Traffic Signal Face (12-12-12-12-12) 6.000 Each 614-72855 Traffic Signal Controller Cabinet 1.000 Each 614-72875 Loop Detector Wire 7,706.000 Lf 614-80385 Rumble Strip 100,045.000 Lf 614-81020 Traffic Signal-Light Pole Steel (2 Mast Arm) 2.000 Each 626-00000 Mobilization 1.000 L S 626-01113 Public Information Management (Tier Iii) 190.000 Day 627-00008 Modified Epoxy Pavement Marking 1,113.000 Gal 627-00013 Pavement Marking Paint (High Build) 1,472.000 Gal 627-30407 Preformed Thermoplastic Pavement Marking (Word- Symbol) (Special) 723.000 Sf 627-30410 Preformed Thermoplastic Pavement Marking (Xwalk- Stop Line) 4,131.000 Sf 630-00000 Flagging 4,000.000 Hour 630-00001 Pilot Car Operation 250.000 Hour 630-00007 Traffic Control Inspection 56.000 Day 630-00012 Traffic Control Management 106.000 Day |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |