Similar Projects
HVAC and Mechanical Products
Term Contract
Post-Bid

Gemini ES CEP Upgrades
Post-Bid
Melbourne Beach, FL 32951

Controlled Humidity Protection System Services
Results
Avon Park, Bradenton, Fort Myers, Palmetto, Saint Petersburg, West Palm Beach, FL

City Hall Police Wing HVAC System Replacement
Results
Less than $150,000 est. value
Sanibel, FL 33957

HVAC and Controls Renovation for Cape Elementary School
Construction
Fort Myers, FL 33904

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Mechanical, Electrical and Plumbing Services Orangewood Elementary School AHU Renovation
Results
$3,500,000 to $4,500,000 est. value
Fort Myers, FL 33901

Air Conditioning and Heating Maintenance Services
Term Contract
Post-Bid
FL 33974

Building Official Services Orangewood Elementary School AHU Renovation
Results
$3,500,000 to $4,500,000 est. value
Fort Myers, FL 33901

Air Handler Replacement
Alteration
Post-Bid
FL 33919

Construction Management Services Orangewood Elementary School AHU Renovation
Results
$3,500,000 to $4,500,000 est. value
Fort Myers, FL 33901

Rooftop Unit (RTU) Replacement
Results

Cafeteria Hood Ventilation Systems Clean, Inspect and Repair
Results
FL

FL-J.N. Darling NWR HVAC Maintenance
Results
Sanibel, FL 33957

Recreation Center Chiller Replacement Project
Results
$248,150 est. value
Sanibel, FL 33957

Last Updated 11/03/2021 11:49 AM
Project Title

Corkscrew Water Treatment Plant Filter Air Supply System Modification

Physical Address View project details and contacts
City, State (County) Fort Myers, FL 33913   (Lee County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To obtain services from a skilled and qualified, to construct a complete and operational air supply header pipe that is above the water level in the adjacent filter basins. 1.2.1.Raise existing 6-inch stainless steel air supply header above the water level in adjacent filters. 1.2.2.Furnish and install new 6-inch Type 316 stainless steel air supply header between Filters 12 and 13. 1.2.3.Cut and reattach blower riser to the elevated air supply header. 1.2.4.Relocate the blowoff valve and actuator at the end of the air supply header. 1.2.5.Extend vertical risers to new header elevation. 1.2.6.Provide new support beams and relocate support brackets to new header elevation

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents