Similar Projects
Southeast Zone Improvements - 281162 - City of Topeka
Infrastructure
Conception
$12,336,000 est. value
Topeka, KS

Meter Vault Replacement - 281218
Alteration
Conception
$6,500,000 est. value
Topeka, KS

Water Line Replacement South West Jackson
Infrastructure
Bidding
$2,000,000 est. value
Topeka, KS 66603

Street Improvement Project
Infrastructure
Bidding
$500,000 est. value
Topeka, KS 66604

Ford Meter Box Brass Service Materials
Infrastructure
Post-Bid
Topeka, KS

Resilient Wedge Gate Valves
Infrastructure
Post-Bid
Topeka, KS

Water Main Replacement
Infrastructure
Results
Topeka, KS 66609

Water Improvement - South West Yorkshire Road and South West Danbury Lane
Infrastructure
Results
Topeka, KS 66606

Central Zone Improvements & Optimizations Phase 2 - 281196
Infrastructure
Conception
$6,430,991 est. value
Topeka, KS

Fire Hydrants and Hydrant Extensions
Infrastructure
Post-Bid
Topeka, KS

Waterline Improvement Project
Infrastructure
Results
Topeka, KS 66630

Ductile Iron Fittings
Term Contract
Post-Bid
Topeka, KS

Pipeline Failure Determination Technology Solution
Term Contract
Results
Topeka, KS

Water Meter Boxes and Extensions
Term Contract
Post-Bid
Topeka, KS

South East California Avenue 45th Street to 37th Street Trafficway and Utility Improvements
Infrastructure
Results
Topeka, KS 66630

Reported 07/13/2022 02:25 PM
Project Title

West Zone Improvements - 281163

Physical Address View project details and contacts
City, State (County) Topeka, KS 66612   (Shawnee County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected September 2025
Bids Due View project details and contacts
Estimated Value $4,906,838
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call to replace transmission mains and upsize existing lines for capacity purposes for the West Pressure Zone. Improvements to the transmission system will be made by creating looped water lines in an effort to improve water distribution and fire protection. As of July 12, 2022, this project is currently in the FY 2023-2032 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents