Similar Projects
Brandonwood Sewer Extension - City of O'Fallon
Infrastructure
Conception
$300,000 CJ est. value
O Fallon, IL 62269

7 North High Street Redevelopment
Build-out, Infrastructure - 8,316 SF
Conception
$300,000 CJ est. value
Belleville, IL 62220

Belleville East Creek Sewer Separation Project
Infrastructure
Design
$10,000,000 CJ est. value
Belleville, IL 62220

Central Park - Lot 1
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
O Fallon, IL 62269

County Wide Striping - Re-Striping Existing Roadways
Infrastructure
Bidding
$500,000 CJ est. value
Belleville, IL 62220

RFP D/B - SAFB Child Development Center Scott AFB, Il
New Construction, Infrastructure - 24,771 SF
Bidding
$25,000,000 CJ est. value
Scott Air Force Base, IL 62225

Winstanley Park (Sinai Village Phase III)
New Construction, Renovation, Infrastructure - 44,122 SF
Post-Bid
$9,000,000 CJ est. value
East Saint Louis, IL 62201

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Wastewater Treatment Facility Improvements Phase II
Renovation, Infrastructure
Results
Belleville, IL

Highway Lighting, Traffic Signal and Repair at Various Locations
Infrastructure
Results
$500,000 est. value

Freddy's Frozen Custard & Steakburgers - Belleville Crossing / Belleville
New Construction, Infrastructure - 3,238 SF
Construction
$850,000 CJ est. value
Belleville, IL 62220

Mid America Commerce Center
New Construction, Infrastructure
Construction
$80,000,000 CJ est. value
Belleville, IL 62269

Brandywine Garden Villas
New Construction, Infrastructure - 62,622 SF
Pending Verification
$75,000,000 CJ est. value
O Fallon, IL 62269

West Presidential Streets Phase 2 - City Of O'Fallon
Infrastructure
Pending Verification
$1,500,000 CJ est. value
O Fallon, IL 62269

Renner Funeral Homes Crematory
New Construction, Infrastructure - 4,950 SF
Conception
$1,000,000 CJ est. value
Belleville, IL 62220

Last Updated 07/21/2023 08:49 AM
Project Title

Lighting on I-55/70/64

Physical Address View project details and contacts
City, State (County) East Saint Louis, IL 62201   (Saint Clair County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Roadway Lighting, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding, Request for Qualifications, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $25,995,034 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Lighting on I-55/70/64 from the Mississippi River to east of the I-64 (Tri-Level) Interchange. Region 5 District 8 Federal Project # HSIPZVSK(274) County(S) St. Clair Key Route(S) FAI 70 Marked Route(S) I-55/70/64 Section(S) 82-3, 4HL-4 State Job #(S) C-98-027-20 Pps #(S) 8-08800-3050 175 Working Days Questions not accepted as of July 25, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 07, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 083 - Lighting on I-55/70/64

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents