Similar Projects
East of Arizona/new Mexico State Line on Nm 264.
Infrastructure
Conception
$2,255,380 CJ est. value
Window Rock, AZ 86515

East of Arizona/new Mexico State Line on Nm 264.
Infrastructure
Conception
$2,255,380 CJ est. value
Window Rock, AZ 86515

Chinle Strip Center
New Construction, Infrastructure - 13,000 SF
Design
$3,400,000 CJ est. value
Chinle, AZ 86503

Chinle Strip Center
New Construction, Infrastructure - 13,000 SF
Design
$3,400,000 CJ est. value
Chinle, AZ 86503

Construction of Lake Valley Individual Wells
Renovation, Infrastructure
Bidding
$1,000,000 CJ est. value
Fort Defiance, AZ 86504

Concrete Walkway Reconstruction and Improvements
Infrastructure
Bidding
$100,000 CJ est. value
Alpine, AZ 85920

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Shoulder Widening
Infrastructure
Results
$17,066,000 est. value
AZ

Pavement Preservation
Infrastructure
Results
$7,195,000 est. value
AZ

RFP Design - Architectural and Engineering Services
LEED Certification, New Construction, Infrastructure
Pending Verification
$500,000 CJ est. value
Fort Defiance, AZ 86504

RFP Engineering - Electrical Construction Services - Pole Structure Replacements and Powerline Construction
Infrastructure
Pending Verification
$500,000 CJ est. value
Fort Defiance, AZ 86504

Chinle Lumber Yard
New Construction, Infrastructure - 6,100 SF
Design
$800,000 CJ est. value
Chinle, AZ 86503

N1012 Road Improvements, To`Nanees`D
Infrastructure
Post-Bid
Window Rock, AZ 86515

Northland Pioneer College - Winslow Head Start Site Improvements
Infrastructure
Results
Holbrook, Saint Johns, Show Low, Springerville, Whiteriver, Winslow, AZ 85902

Last Updated 07/07/2023 11:06 AM
Project Title

Ganado School Loop Road Apache County Road C-420

Physical Address View project details and contacts
City, State (County) Ganado, AZ 86505   (Apache County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Apache County Road C-420 WE Project Notice is hereby given that sealed Bids are being solicited from qualified general contractors for the reconstruction of County Road C-420 (Ganado School Loop) in Ganado, AZ. The types of work on this project shall include, but not be limited to the following: - Removal of existing concrete - Install 4" curb and gutter, 6" valley gutter, and 5' sidewalk - Construct type "A" and "C" catch basin - Remove and replace 18" CMP - Removal of AC pavement and construction of new 3" AC pavement and 8" base course The construction time to complete the project is 120 calendar days from the date of the Notice to Proceed The Apache County reserves the right to reject any or all bids and to award all or part of the bid. Nevertheless, except when rejections of bids are required by law, the County reserves the right to waive any informalities of the Bid Questions regarding the technical specifics of the project should be directed to Ferrin Crosby, Apache County Engineer, fcrosby@apachecountyaz.gov (928) 337-7530

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents