Similar Projects
Multimodal Improvements 2022/23 - City of Eureka
Infrastructure
Conception
$3,936,420 est. value
Eureka, CA

C Street Bike Boulevard - City of Eureka
Infrastructure
Conception
Less than $1,939,000 est. value
Eureka, CA 95501

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Repair Storm Damage
Infrastructure
Design
$4,522,000 CJ est. value
Myers Flat, CA 95554

RFP D/B - Toma Resilience Campus
Infrastructure
Bidding
$4,000,000 CJ est. value
Blue Lake, CA 95525

Community School Basketball Court
Infrastructure
Bidding
$50,000 CJ est. value
Eureka, CA 95501

Trinidad Fire Station - Paving Services
Infrastructure
Post-Bid
Trinidad, CA 95570

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Bald Hills Road Resurfacing Project
Infrastructure
Results
Hoopa, CA 95546

RHMA-G and HMA
Infrastructure
Results
$26,000,000 est. value
CA

Nordic Aquafarms / Samoa Peninsula
New Construction, Infrastructure
Pending Verification
$400,000,000 CJ est. value
Samoa, CA 95564

Y Street Drive Through Restaurant
New Construction, Infrastructure - 2,800 SF
Pending Verification
$1,000,000 CJ est. value
Eureka, CA 95501

Elk River Interpretive Center - City of Eureka
Alteration
Conception
$3,500,000 est. value
Eureka, CA

Curve Improvement
Infrastructure
Design
$7,290,000 est. value
Eureka, CA

RFQ D/B - Energy Research & Sustainability
New Construction, Infrastructure - 23,000 SF
Bidding
$21,549 CJ est. value
Arcata, CA 95521

Last Updated 12/13/2022 05:12 PM
Project Title

Redway Drive and Redwood Drive Highway Safety Improvement Project

Physical Address View project details and contacts
City, State (County) Redway, CA 95560   (Humboldt County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $204,100 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done consists of traffic control system, concrete removal, construction of curb ramps, installation of street lighting, placing micro-surfacing over existing asphalt, roadway striping and pedestrian crossing markings. Bidders are advised that the work must be completed within 40 working day Bidders are advised that the work must be completed within 40 working days. Inquiries or questions based on alleged patent ambiguity of the plans, specifications or estimate must be communicated as a bidder inquiry prior to bid opening. Any such inquiries or questions, submitted after bid opening, will not be treated as a bid protest. No pre-bid meeting is scheduled for this project. The successful Bidder shall furnish a Payment Bond and a Performance Bond. For this contract, the County has included a Disadvantaged Business Enterprises (DBE) goal of 14 Percent. Bidders need not achieve the percentage stated as a condition of award.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents