Similar Projects
Miller Farms (Lateral B) Drainage Improvements - City of Germantown
Infrastructure
Conception
Less than $7,600,000 est. value
Memphis, TN 38138

Employee Parking Garage - Shelby County
New Construction, Infrastructure
Conception
$16,500,000 CJ est. value
Memphis, TN 38103

The Registry at Thornwood Phase 7
New Construction, Infrastructure - 128,000 SF
Design
$18,000,000 CJ est. value
Germantown, TN 38138

Piperton Historic House Renovation
Infrastructure, Renovation
Design
$250,000 CJ est. value
Piperton, TN 38017

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Complete Site Prep 1st Fl. Bldg. 1A SPECT-CT
Term Contract
Post-Bid
$250,000 to $500,000 est. value
Memphis, TN 38104

Hinton Parking Lot
Infrastructure
Post-Bid
Collierville, TN

ADA Curb Ramps - Group 63
Results
$312,732 est. value
Memphis, TN

ADA Curb Ramps - Group 62
Results
$633,100 est. value
Memphis, TN

Glasgow PUD - Phase 1
New Construction, Infrastructure
Pending Verification
$57,000,000 CJ est. value
Germantown, TN 38139

Greyhound Station Redevelopment Project
Demolition, New Construction, Infrastructure - 34,000 SF
Pending Verification
$40,700,000 CJ est. value
Memphis, TN 38105

Holmes Road - Shelby County
Infrastructure
Conception
$2,400,000 CJ est. value
Memphis, TN 38103

The Congregation
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Germantown, TN 38138

Asphalt Mix & Thermoplastic Markings
Alteration
Post-Bid
Germantown, TN

Last Updated 12/28/2022 04:06 AM
Project Title

Wolf River Regional Greenbelt Trail - Phase I - Town of Collierville

Physical Address View project details and contacts
City, State (County) Collierville, TN 38017   (Shelby County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2026
Bids Due View project details and contacts
Estimated Value $425,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is the design and construction of Phase I of the Wolf River Regional Greenbelt Trail. Components of the trail project includes design, drainage, trail construction of approximately 4,000 linear feet of asphalt, bridge installations, interpretive signage, and trail amenities such as benches and trash receptacles. The proposed trail would connect WC Johnson Wolf River Overlook Boardwalk and the Wellington Farms Subdivision. This project will be submitted as a 2024 TDEC LPRF 50/50 Grant. This project is in included in the City's or County's FY 2022 - 2023 Capital Improvement Plan (CIP). As of December 28, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents