Similar Projects
Pavement Improvements at Various Locations
Post-Bid
Matteson, IL

Culvert Repairs
Post-Bid
Palos Hills, IL 60465

Pullman State Historic Site Development
Renovation
Results
Less than $1,500,000 est. value
Chicago, IL 60628

Sanitary Sewer Improvements
Results
$1,000,000 to $5,000,000 est. value
Matteson, IL 60423

Construction Variable Width Paver Resurfacing
Post-Bid
Harwood Heights, IL

I-19-4476 Roadway and Bridge Widening and Reconstruction
Results
$25,000,000 to $50,000,000 est. value
IL

Village Wide Emergency Water and Sewer Repair Work
Term Contract
Post-Bid
Oak Park, IL

2020 Crack Filling Program
Results
Less than $20,000 est. value
Indian Head Park, IL 60525

(6.69-Mile) Improvement on 1-290 from 1-88 to East of Austin Blvd Consist of Sealing Cracks and Joints
Post-Bid
Bellwood, Broadview, Forest Park, Hillside, Maywood, Oak Park, IL

I-20-4528 Roadway Reconstruction
Results
Less than $10,000,000 est. value
Oak Park, IL 60301

Construction Management Services Pavement Preservation and Rehabilitation Services at Various Locations
Post-Bid
Chicago, IL

West 10th Street Storm Culvert Replacement
Results
Less than $403,825 est. value
Chicago Heights, IL 60411

Asphalt Paving & Related Materials & Services - 3 Year Contract
Renovation, Term Contract
Post-Bid
Chicago, IL 60638

2020 Parking Lot Replacement
Results
Chicago Heights, IL 60411

Central Division - Asphalt Paving Maintenance
Post-Bid

Last Updated 03/04/2022 11:57 AM
Project Title

2022 Street Rehabilitation

Physical Address View project details and contacts
City, State (County) Winnetka, IL   (Cook County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,475,557
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes pavement milling and resurfacing, local base repair, with pavement excavation and reconstruction on noted streets, alleys, in both HMA and PCC, curb & gutter removal and replacement, sidewalk removal and replacement, driveway removal and replacement, removal and replacement of drainage structures, adjusting/replacing frames and grates/lids, rehabilitation and replacement of sanitary manholes, construction of new water main and replacement of water services (on noted street), and related collateral work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents