Similar Projects
Replacement of Tank Mixer at Manchester Water Tower
Infrastructure
Design
$27,649 CJ est. value
Wheaton, IL 60187

Water Tower Replacement
Infrastructure
Bidding
$1,649,000 est. value
Cullom, IL 60929

Water Treatment Plant - Brine Tank Rehabilitation (Contract C)
Renovation
Bidding
$735,000 CJ est. value
Riverton, IL 62561

Water System Improvements Division 2: Water Tower Rehabilitation
Post-Bid
Blue Mound, IL

100,000 Gallon Elevated Tank Rehabilitation
Post-Bid
Marion, IL

New Ground Water Storage Tank
New Construction, Demolition
Results
Loda, IL 60948

Water Storage Tank
Results
Brimfield, IL 61517

Fuel Tank Removal and Replacement
Post-Bid
Waukegan, IL 60087

Southwest Tank Rehabilitation
Results
Belvidere, IL

Underground Storage Tank Fill-In-Place
Post-Bid
IL

Elevated Water Storage Tank
Results
Grayslake, IL

Power Washing of the Fairfield Way Ewst (2.0 mg)
Post-Bid
Montgomery, IL

Briar Lane Elevated Water Storage Tank Maintenance and Repainting
Infrastructure
Results
Less than $564,800 est. value
Oak Forest, IL

C213--SOURCES SOUGHT: Underground Storage Tanks and Above Ground Storage Tanks Maintenance and Testing
Post-Bid
Danville, IL 61832

Phase V System Improvements Elevated Water Storage Tank Contract "L"
Alteration
Results
Less than $1,050,000 est. value
IL

Last Updated 07/29/2022 03:05 PM
Project Title

750,000 Gallon Spheroid (East Tower - Hickory Creek) Exterior Repaint with Containment Wet Interior Repaint Dry Interior Partial Repaint And Miscellaneous Repairs

Physical Address View project details and contacts
City, State (County) Mokena, IL 60448   (Will County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $916,800 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Village of Mokena is accepting sealed bids for cleaning, repairing, and painting a 750,000 gallon water storage tank located near the Hickory Creek Metra Station. Contractor shall be required to pay no less than prevailing wage rates on the project as established by the United States Department of Labor and the State of Illinois Department of Labor. Failure to provide required forms will result in disqualification from this bidding process. The Village of Mokena reserves the right to reject any and all bids or parts thereof and waive any technicalities or irregularities in the bids and disregard all non-conforming or conditional bids or counter proposals. The structure is a 750,000 gallon spheroid elevated water storage tank with a low-water level of 88 ft. 4 in. located at 9241 W. 189th St. in Mokena, Illinois.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 09 - Finishes, Painting.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents