Similar Projects
2021 Waterline Improvements
Bidding
$710,248 est. value
Fremont, OH

9th Street Wastewater Pump Station Improvements
New Construction
Bidding
$494,000 est. value
Genoa, OH

Construction of the North Main Street Waterline Replacement Project
Post-Bid
Less than $95,000 est. value
Arlington, OH

Water Service Replacement
Post-Bid
Less than $60,000 est. value
Alexandria, OH 43001

Sunrush Pump Station Improvements
Results
Less than $390,000 est. value
Chillicothe, OH

Navarre Avenue Waterline Replacement Phase 1
Results
Less than $2,655,145 est. value
Oregon, OH 43616

Booster Station Replacement - Portersville East Branch Water
Construction
$270,000 est. value
Malta, OH 43758

Wightman's Grove Wastewater Treatment Plant
Post-Bid
Less than $995,000 est. value
OH

Waterline Installation
Results
$114,317 est. value
Ravenna, OH 44266

Waterline Replacement
Post-Bid
Less than $138,700 est. value
Syracuse, OH 45779

Water Main Extensions
Results
$1,900,000 est. value
North Zanesville, OH 43701

Water and Distribution Supplies
Post-Bid
Avon, OH 44011

Erie Street Waterline Replacement Improvement
Results
Less than $1,050,000 est. value
Painesville, OH 44077

Water Meter Upgrade
Post-Bid
Less than $500,000 est. value
Ironton, OH 45638

Salem Avenue Water Main Improvements Phase III
Results
Less than $850,000 est. value
Dayton, OH 45390

Last Updated 12/18/2020 09:48 AM
Project Title

Lower Alum Creek Relief Pump Station and Forcemain Project Force Main Contract

Physical Address View project details and contacts
City, State (County) Lewis Center, OH 43035   (Delaware County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,703,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Bidder shall furnish all labor and material to construct approximately 8,000 LF of 24” forcemain and 2,100 LF of 30” gravity sewer to connect to Lower Alum Creek Relief Pump Station; 8'x7' box culvert replacement; and all associated improvements as shown in the contract documents.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents