Similar Projects
Spring Hill Sewer Separation and Streetscapes Phase 1
Infrastructure
Bidding
$22,982,000 est. value
Somerville, MA

Construction of the Sewer Rehabilitation - Phase 1
Infrastructure
Bidding
$887,000 est. value
Dracut, MA

Catch Basin Cleaning
Post-Bid
Less than $40,000 est. value
Winchester, MA

Catch Basin Cleaning Services
Post-Bid
Burlington, MA

Downtown Hudson Rotary Phase 2 - Sewer Cleaning and Lining
Results
$105,000 est. value
Hudson, MA 01749

Route 9 Sewer Rehabilitation
Results
Natick, MA 01760

Catch Basin Cleaning, As Needed
Term Contract
Bidding
$269,000 est. value
Dracut, MA

Supply Catch Basin and Manhole Frames, Grates and Covers
Post-Bid
Melrose, MA

Phase 3 Collection System Lining
Results
Less than $1,350,000 est. value
Reading, MA 01867

FY22 Remedial Reconstruction of Sanitary Sewers, Combined Sewer and Storm Drains and Emergency Repairs
Infrastructure
Bidding
$3,400,000 est. value
Cambridge, MA

Water, Sewer and Drainage Replacement and Emergency Repairs
Post-Bid
Melrose, MA

CCTV Installation Under Sewer System Evaluation Study (SSES) Projects
Term Contract
Results
Somerville, MA 02143

Septic & Grease Trap Services at Ft Devens, MA
Post-Bid
Fort Devens, MA

Catch Basing Tailings Removal
Results
Waltham, MA

Replace Approximately 100 Feet Underground Sewer Line
Post-Bid
Westford, MA

Last Updated 08/27/2021 08:58 AM
Project Title

CIP Project 1B Rehabilitations

Physical Address View project details and contacts
City, State (County) Watertown, MA   (Middlesex County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,947,200
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Open cut repair of 352 l.f. of sewer, replacement of 13 sewer service connections, installation of nine (9) sewer manholes, open cut repair of 95 l.f. of drain, installation of 25,899 l.f. of cured-inplace pipe and reinstatement of 523 services, installation of 6,013 l.f. of structural cured-in-place pipe and reinstatement of 154 services, cutting 69 protruding service connections, cementitious lining of 1,444 v.f. of manholes, installation of nine (9) manhole frame and covers, building of two (2) manhole bench and inverts, cleaning and inspection of 15 laterals, and installation of 15 cured in-place lateral liners, installation of five (5) linear feet of cured-in-place short liners, and cleaning and inspection of 4,024 l.f. of sewer and drain.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents