Similar Projects
SRF - Secondary Clarifiers Improvements - City of East Lansing
Renovation, Alteration
Conception
$21,000,000 est. value
East Lansing, MI 48823

Oakwood and East Glencairn Phase 2 - City of East Lansing
Infrastructure
Conception
$1,789,715 est. value
East Lansing, MI 48823

Panda Express & Retail Building / Lansing
New Construction - 4,744 SF
Design
$2,000,000 CJ est. value
Lansing, MI 48912

BCI Qualified - Independent Contractor
New Construction
Bidding
Lansing, MI

Rehabilitation of Steam Manholes MH905 and MH910
Infrastructure
Bidding
$300,000 CJ est. value
Lansing, MI 48933

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

FY22 Utility Improvements Project
Infrastructure
Results
East Lansing, MI 48823

Water Main Restorations
Infrastructure
Results
$400,000 est. value
Lansing, MI

Delta Crossing: Phase 2
New Construction - 188,000 SF
Construction
Lansing, MI 48951

Coratti's Pizzeria
Renovation, Addition - 7,802 SF
Pending Verification
$1,500,000 est. value
East Lansing, MI 48823

Former Sears Building Redevelopment / Lansing
Demolition, New Construction, Infrastructure - 196,000 SF
Pending Verification
$51,000,000 CJ est. value
Lansing, MI 48912

SRF Rivers Waters Edge District Improvements - City of East Lansing
Infrastructure
Conception
$10,200,000 est. value
East Lansing, MI 48823

Hayhoe Riverwalk Trailhead Restroom
Infrastructure
Bidding
$181,460 CJ est. value
Mason, MI 48854

Lake Lansing Park South Improvements
Infrastructure, Renovation
Post-Bid
$200,000 CJ est. value
Meridian charter Township, MI 48840

Last Updated 08/07/2023 10:08 PM
Project Title

Natural Science - Renovations to Room 210

Physical Address View project details and contacts
City, State (County) East Lansing, MI 48823   (Ingham County)
Category(s) Commercial, Education, Laboratory, Sewer and Water
Sub-Category(s) College/University, Food/Beverage Service, Laboratory, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $83,600 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves . Removal of certain interior walls--open up space . New student work stations . Removal of existing Trane air conditioning unit with associated ductwork and piping, removal of ceiling in room 210B, removal of cabinets/countertops/sinks throughout and removal of asbestos containing floor tile and lighting fixtures. . New work includes flooring, . painting walls and ceiling, . lighting & ceiling fans, . electrical/data rework to perimeter walls for new workstations (10) and a conference table with (6) chairs (furniture not included within PCA scope). . New kitchenette with sink and upper cabinets as well as space for a microwave and refrigerator, . window air conditioner, . room signs and whiteboard. . All scope will require rework of plumbing, steam heat controls, and fire alarm. The substantial construction completion date for the project, as set forth in the project manual and drawings is December 28, 2023. See applicable start date and interim completion dates in the General Requirements (Division One) - Part 1 Work Sequence section. The Owner reserves the right to reject any or all proposals either in whole or in part and to waive any irregularities. Withdrawal of any proposal is prohibited for a period of 120 days after the actual date of the opening thereof. Performance and Labor and Material Bonds are required as set forth in the Instructions to Bidders. The University makes a continuous effort to broaden its business relationships with Minority Business Enterprise (MBE) contractors, Women Business Enterprise (WBE) contractors, and small business concerns (including veteran-owned small business, service-disabled veteran owned small business, HUB Zone small business, and small disadvantaged business concerns certified by the U.S. Small Business Administration). For purposes of this paragraph, MBE is defined as a business enterprise of which more than 50% of the voting shares or interest in the business is owned, controlled, and operated by individuals who are members of a minority and with respect to which more than 50% of the net profit or loss attributable to the business accrues to shareholders who are members of a minority. WBE is defined as a business enterprise of which more than 50% of the voting shares or interest in the business is owned, controlled, and operated by women and with respect to which more than 50% of the net profit or loss attributable to the business accrues to the women shareholders.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Entrances, Automatic Entrances, Windows, Hardware, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Laboratory Furniture, Multiple Seating, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Ventilation Hoods, Commercial-Kitchen Hoods, Central Heating Equipment, Central Cooling Equipment, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents