Similar Projects
Catch Basin Cleaning and Inspection
Infrastructure
Bidding
Southington, CT

Septic System Replacement
Post-Bid
Less than $75,000 est. value
Manchester, CT 06040

Annual Catch Basin Cleaning Services
Term Contract
Post-Bid
Berlin, CT

Large Diameter Rehabilitation Program Broad Street Area and Gully Brook Interceptor
Results
Hartford, CT 06142

Water and Sewer Service Replacement
Results
$100,000 est. value
New Britain, CT 06053

Waterworks and Sewerage Supplies
Post-Bid
Manchester, CT

Sanitary Sewer CCTV Inspection Services
Term Contract
Results
South Windsor, CT

Sewer Line Repair
Post-Bid
Windsor, CT 06095

AFFF Valve Installation (TASM-G)
Results
$110,000 to $120,000 est. value
Hartford, CT 06105

Single Family Home Rehabilitation
Post-Bid
Windsor, CT

Phase II - Chapel Road Sewer Improvements Project
Results
$1,300,000 to $1,500,000 est. value
South Windsor, CT 06074

Woodland Street Sewer Replacment Project
Infrastructure
Post-Bid
Simsbury, CT 06070

Plymouth Lane Water Main and Sanitary Sewer Replacement
Results
$850,000 est. value
Manchester, CT

Meadow Hill Sanitary Sewer Holding Tank Project
Infrastructure
Post-Bid
$45,000 to $55,000 est. value
East Hartford, CT 06108

Annual Requirements for Manhole Riser Rings, Frames, and Covers
Term Contract
Results
Bristol, CT

Reported 01/14/2022 12:00 AM
Project Title

Clark Street Force Main Line-Stop Valve

Physical Address View project details and contacts
City, State (County) South Windsor, CT 06074   (Hartford County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work to be performed under this contract shall be the replacement of 20 feet of 16" prestressed concrete cylinder pipe sanitary sewer force main with 16" ductile iron pipe, including excavation, backfill, disposal and fittings within the confines of a pump station grounds. The project shall also include the installation of a 14" plug valve within a pump station dry well. The work will require bypassing wastewater around the pump station to maintain sewer service.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents