Similar Projects
Skiff Point
New Construction
Design
Clearwater, FL 33767

Hathaway Park Ramp and Boarding Pier Repairs
Infrastructure
Bidding
Punta Gorda, FL 33982

West Martello Seawall Hurricane Repairs
Infrastructure, Alteration
Bidding
Key West, FL 33040

MRD - 12Nov2020 - Installation of Waterways Signs, Lights and Pilings
Post-Bid
FL

Repairs to East Side of Pier Railing
Post-Bid
Deerfield Beach, FL 33441

Repair Waterfront and Storm Sewer Systems at U.S. Coast Guard Station Panama City, FL
Results
$500,000 to $1,000,000 est. value
Panama City, FL 32408

Lignumvitae Key Botanical State Park - Repair and Renovate Dock
Results
Islamorada, FL 33036

The Wharf
New Construction - 11,982 SF
Construction
$965,056 est. value
Saint Augustine, FL 32084

Bay Point Marina
New Construction, Infrastructure
Construction
$10,000,000 est. value
Panama City, FL

Construction of Lake Lotus Park Repairs
Infrastructure
Bidding
$100,000 est. value
Altamonte Springs, FL 32714

Design-Build Floating Day Dock and Dinghy Dock
Post-Bid
Bradenton Beach, FL 34217

Rebuild UPH STA Ponce de Leon Inlet, New Smyrna Beach, FL
Results
$100,000 to $6,000,000 est. value
New Smyrna Beach, FL 32168

Spyglass Drive Public Beach Access Point 3
Infrastructure
Bidding
$185,000 est. value
Lower Grand Lagoon, FL 32408

Martin County Bs/Mpz Marker Construction Project
Post-Bid
Jensen Beach, Stuart, FL

Lake Echo Dock
Results
Lake Alfred, FL 33850

Last Updated 03/11/2022 08:30 AM
Project Title

Berth 268 Rehabilitation

Physical Address View project details and contacts
City, State (County) Tampa, FL   (Hillsborough County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Excavation of upland soil to remove surcharge on existing bulkhead, cut existing bulkhead down to waterline, demolish existing concrete wharf, and install new bulkhead wall, tie backs, water lines, boxes, fencing and bollards

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents