Similar Projects
Asphalt Mix - Paving Project 2021
Term Contract, Alteration
Post-Bid
Norris, TN 37828

Cheatham Stoplog Concrete Storage Slab
Term Contract, Infrastructure, Alteration
Post-Bid
$1,000,000 to $5,000,000 est. value

Paving Work at Briceville Elementary School
Infrastructure
Results
Briceville, TN 37710

Paving Project at Dutch Valley Elementary School
Infrastructure
Results
Clinton, TN 37716

Oak Ridge General Aviation Airport
New Construction, Infrastructure
Pending Verification
$54,413,000 CJ est. value
Oak Ridge, TN 37830

Oak Ridge General Aviation Airport
New Construction, Infrastructure
Pending Verification
$54,413,000 CJ est. value
Oak Ridge, TN 37830

Oak Ridge Water Treatment Plant
Infrastructure
Post-Bid
$500,000 CJ est. value
Oak Ridge, TN 37830

Resurfacing on US 25W (SR 9)
Infrastructure
Results
$5,000,000 est. value
Clinton, TN 37716

The Ring to Target Beam Transport Stub Construction
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Oak Ridge, TN 37830

Main Street Lofts Phase 2
New Construction, Infrastructure - 134,688 SF
Post-Bid
$32,000,000 CJ est. value
Oak Ridge, TN 37830

Sanitary Sewer Point Repair Contract
Infrastructure
Results
$194,400 CJ est. value
Oak Ridge, TN 37830

Construction of K-25 Building, Roads and Grounds Improvements
New Construction, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Oak Ridge, TN 37830

FY2023 Gateway Monument Sign
Infrastructure
Post-Bid
$400,000 CJ est. value
Oak Ridge, TN 37830

Last Updated 11/30/2022 10:55 AM
Project Title

Take 5 Oil Change / Oak Ridge

Physical Address View project details and contacts
City, State (County) Oak Ridge, TN 37830   (Anderson County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes new construction of quick oil change retail development. As of November 30, 2022, this project is in planning. Site plans have been approved by the City of Oak Ridge. Information regarding the architect and general contractor has not been disclosed. No construction timeline has been established at this time.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

3,823 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents