Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Reconstruct Drainage
Infrastructure
Design
$4,770,000 CJ est. value
Willits, CA 95490

RFQ/P D/B - New Ukiah Courthouse
New Construction, Infrastructure - 82,000 SF
Bidding
$136,267,000 CJ est. value
Ukiah, CA 95482

Mendocino College Emergency Access Road Project
Infrastructure
Bidding
$300,000 CJ est. value
Ukiah, CA 95482

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

Realign and Widen Roadway with HMA, Place Guardrail and Gabion
Infrastructure
Results
$3,470,000 est. value
CA

Bell Avenue Complete Street Rehabilitation Project
Infrastructure
Results
$4,163,870 est. value

Redwood Quality Management Company Mental Health Rehabilitation Center and Administration Offices
New Construction, Infrastructure - 11,571 SF
Pending Verification
$2,700,000 CJ est. value
Ukiah, CA 95482

Construct Wall
Infrastructure
Design
$10,125,000 est. value
CA

Bridge Replacement Services
Demolition, New Construction, Infrastructure
Bidding
$6,000,000 CJ est. value
Fort Bragg, CA 95437

Place HMA, Furnish Polyester Concrete Overlay, and Concrete Barrier.
Infrastructure
Post-Bid
$4,490,000 CJ est. value
Longvale, CA 95490

Roadway Excavation, Drilled Hole and Steel Soldier Pile
Infrastructure
Results
$2,650,000 est. value
Piercy, CA 95587

Widen Shoulders
Infrastructure
Design
$1,639,000 est. value
Fort Bragg, CA 95488

Parking Lot Repair
Infrastructure
Bidding
$200,000 CJ est. value
Ukiah, CA 95482

Last Updated 09/28/2022 01:54 AM
Project Title

State Street and Dora Street Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Ukiah, CA 95482   (Mendocino County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,511,530 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

All of the work to be performed is within the City of Ukiah. On South Dora Street from Beacon Lane to Wabash Avenue: work involves complete full width surface grinding down 2" and placing 2: AC overlay over existing asphalt concrete pavement. On South Dora Street from Wabash Avenue to Washington Avenue: work involves complete reconstruction of roadway including full excavation and placing 6" AC over 12" class II base with soil stabilization fabric. ADA curb ramps will be installed at locations shown and listed in the specifications. On South State Street from Beacon Lane to Cherry Street: work involves edge grinding down 2" and placing 2" AC overlay over existing asphalt concrete pavement. ADA curb ramps will be installed at location shown and listed in the specifications. Bid Bond Percentage: 10% Liquidated Damages: $500.00 Per Calendar Day Project Duration: 50 Work Days

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents