Similar Projects
Pump Seals
Post-Bid
Yonkers, NY 10701

Backwash Pumps and VFD`s Replacement for the Water Treatment Plant
Post-Bid
Oneonta, NY 13820

Merriewold Wellfield Improvements
Results
Blooming Grove, NY 10914

Replace Relief Wells at Portville Flood Control Project
Results
$1,000,000 to $2,000,000 est. value
Portville, NY 14770

Sanitary Sewer Improvements/Replacement of Grinder Pumps
Post-Bid
Sand Lake, NY 12153

Maintenance Contract for the Town of Bethlehem Well Pumping Systems
Term Contract
Results
Delmar, NY 12054

United Wappinger Water District - Hilltop Well Connection
Post-Bid
Less than $320,000 est. value
Wappingers Falls, NY 12590

Town of Watson Water District #4 Extension #1
Results
Less than $6,000,000 est. value
Lowville, NY 13367

Water District 12 Wellfield Improvements Project
Post-Bid
Monroe, NY 10950

Complete Turnkey Rebuilding of an Existing Sulzer/Johnston Vertical Turbine Pump
Results
Millwood, NY 10546

Submersible Pumps
Post-Bid
White Plains, NY 10601

Furnish Submersible Pumps as Specified
Term Contract
Results
Syracuse, NY 13202

Replacement of the Fire Pump at Riverview Towers and Replacement of the Water Heaters
Post-Bid
Less than $230,000 est. value
Ogdensburg, NY 13669

Pumps - Premium Efficiency Solids Handling Pumps-Hydromatic
Term Contract
Results
Orangeburg, NY 10962

Screw Pump Replacement at Middletown WWTF
Post-Bid
Less than $600,000 est. value
Middletown, NY 10940

Last Updated 10/19/2021 08:39 AM
Project Title

Clarence Research Park WRRF Outfall Improvements - Contract 25

Physical Address View project details and contacts
City, State (County) Buffalo, Clarence, NY 14031   (Erie County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of installation of multiple infiltration wells for the effluent outfall from a water resource recovery facility. Work also includes associated piping, valves, fittings, site restoration and permitting. Infiltration Well : The Contractor shall furnish all labor, materials, tools, equipment, and incidentals required to complete all work shown and/or specified to install an infiltration well. Plug Valve : The Contractor shall furnish all labor, materials, tools, equipment, and incidentals required to complete all work shown and/or specified to install a plug valve. 6” PVC Pipe and Fittings : The Contractor shall furnish all labor, materials, tools, equipment, and incidentals required to complete all work shown and/or specified to install each lineal foot of piping and necessary fittings. Lawn Restoration Per Well : The Contractor shall furnish all labor, materials, tools, equipment, and incidentals required to complete all work shown and/or specified to complete lawn restoration.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 22 - Plumbing.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents