Similar Projects
$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Post-Bid
Less than $98,000,000 est. value

Regional A-E Environmental Services
Renovation, Term Contract
Post-Bid

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

Architectural and Engineer /Design and Construction Management Services
Renovation, Alteration
Results
Des Moines, IA 50314

Strategic Visioning Services
Alteration
Post-Bid
Windsor Heights, IA

On-Call Sidewalk and Trail Design and Construction Phase Services
New Construction, Term Contract
Post-Bid
Des Moines, IA

Architect-Engineer Services for Various Civil Works and Support for Other Agencies IDIQ
Renovation, Term Contract
Post-Bid
Less than $250,000,000 est. value

East Army Post and South East 36 Reconstruction
New Construction, Infrastructure
Post-Bid
Des Moines, IA 50982

Miscellaneous Traffic Studies
Infrastructure
Post-Bid
Des Moines, IA

DPS P09 Parking Lot Replacement
Renovation, Infrastructure
Post-Bid
Des Moines, IA

TH Grand Avenue Public Parking Lot Wall Repair Design Services
New Construction, Infrastructure
Post-Bid
Des Moines, IA 50312

CC DAS Tunnel Joint Repair
Renovation, Infrastructure
Post-Bid
Des Moines, IA

Mckinley Avenue Reconstruction Engineering Services
Infrastructure
Post-Bid
Des Moines, IA 50982

Fleur Drive Water Treatment Plant High Lift Variable Frequency Drive (VFD)
Renovation
Post-Bid
$300,000 CJ est. value
Des Moines, IA 50321

RFP Engineering - Post 12 Driveway Repairs
Infrastructure
Post-Bid
$300,000 CJ est. value
Des Moines, IA 50309

Last Updated 05/01/2023 09:32 AM
Project Title

RFP Engineering - Douglas Avenue Plantings - West of Patricia Drive to North Walnut Creek

Physical Address View project details and contacts
City, State (County) Urbandale, IA 50322   (Polk County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected October 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $709,800 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Urbandale is requesting your firm to submit a proposal for design services for the Douglas Avenue Plantings from west of Patricia Drive to North Walnut Creek. The City's professional services agreement will be required. This process will not involve interviews with the prospective firms unless deemed necessary by the City to make a final selection. The consultant will provide limited construction inspection services as noted below. Below I have described the work being requested. Also attached is a drawing of the area and the Douglas Avenue Beautification Master Plan for your information. This design will involve the streetscape improvements of Douglas Avenue from west of Patricia Drive to North Walnut Creek. The proposed streetscape improvements are to be based off the adopted 2011 Douglas Avenue Beautification Mater Plan and adapted as necessary to meet the conditions of the corridor after the Douglas Avenue Urbanization project is completed. The proposed Capital Improvements Program has designated $709,800 for the design and construction of the project. The proposed design extends approximately 250 feet west of Patricia Drive to the west side of North Walnut Creek and includes the medians and both sides of the right-of-way. The exact extent of the project is subject to change after review of the plans and cost opinions. The concept plans shall be produced in a manner that allows for elements of the design to be reviewed and selected to stay within the project budget. The proposed design shall use a similar plant palette indicated in the master plan. Signage shall be similar in character to other signs and monuments on Douglas Avenue. It is the City's intent to bid this project in February 2022 and have it completed by Fall 2022. Related project items may include minor grading, plantings, landscaping, signage, irrigation, and electrical. Any work indicated in the Master Plan that entails replacement of pavement for aesthetic purposes is beyond the scope of this project. If you have any questions regarding this request for proposals, please call me at 515-278-3950. Project Schedule Consultant Agreement to Council 06/15/2021 Concept Submittal 08/27/2021 Preliminary Plan Submittal 10/29/2021 Final Design Completion 12/31/2021 Project Letting February 2022 Installation Completion Fall 2022 The method of Contractor Selection has not been Determined at this time. As of May 1, 2023, no new information available

Details

Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents