Similar Projects
High School and Elementary Improvements
Renovation
Post-Bid
Battle Creek, MI

High School and Elementary Improvements
Renovation
Post-Bid
Battle Creek, MI

High School - Fire Alarm Replacement
Renovation
Results
Battle Creek, MI

Pennfield Schools - Bid Package 001 - Pennfield Boilers and Athletic Surfaces
Renovation, Infrastructure
Results
$572,055 CJ est. value
Battle Creek, MI 49017

2021 Series 1 Bond
Renovation
Post-Bid
Battle Creek, MI 49015

Foundation for Behavioral Resources - Charter School
Renovation - 39,194 SF
Post-Bid
Battle Creek, MI 49014

2 Elem School Remote/Portable Classrooms
Renovation
Post-Bid

Flat Rock Esser Funds 2022 Project
Renovation
Post-Bid

Upgrading HVAC Automation Systems - Trane Ensemble and SC Upgrades
Renovation, Alteration
Post-Bid
$130,000 est. value
Marshall, MI

Lakeview School District Middle School - Renovation and Addition - BP 3.1, 7.4, 7.5, 9.9, 11.4, 12.3,14.2, 21.1, 22.1, 23.1 H, 32.1, 32.2
Addition, Infrastructure, Build-out
Post-Bid
$4,000,000 CJ est. value
Battle Creek, MI 49015

Lakeview School District - Lakeview Middle School - Asbestos Remediation
Term Contract, Infrastructure
Post-Bid
$80,000 CJ est. value
Battle Creek, MI 49015

CW Post Stadium Track & Football Surface Replacement
Infrastructure
Post-Bid
$225,000 CJ est. value
Battle Creek, MI 49017

Lakeview School District Middle School - Renovation and Addition - BP 2.05, 4.2, 5.1, 6.1, 8.8, 9.2, 9.6, 26.1, 31.1, 32.3
Addition, Infrastructure, Build-out
Post-Bid
$4,000,000 CJ est. value
Battle Creek, MI 49015

Lakeview School District Middle School - Renovation and Addition - BP 8.1 Doors, Frames, and Hardware
Addition, Infrastructure, Build-out
Post-Bid
$4,000,000 CJ est. value
Battle Creek, MI 49015

Lakeview School District Middle School - Renovation and Addition - BP 26.1 Electrical
Addition, Infrastructure, Build-out
Post-Bid
$4,000,000 CJ est. value
Battle Creek, MI 49015

Last Updated 11/22/2022 01:06 PM
Project Title

Calhoun ISD Doris Klaussen Pool Infill - Rebid of 6.1 General Trades and 22.2 Plumbing & HVAC

Physical Address View project details and contacts
City, State (County) Battle Creek, MI 49014   (Calhoun County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $160,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

*A few things to note: All bidders must submit a bid for a Bid Package in its entirety. No partial Bid Packages will be accepted. All bids are to include a completed scope of work for the Bid Packages (no scope of work excluded). See Project Manual, Section G, Scopes of Work. A Bid Bond or Certified Check MUST be submitted with your bid. Regardless of bid amount. Please see the BID REQUIREMENTS section below. PROJECT: CISD Doris Klaussen Developmental Center - Pool Infill ***RE-BID OF BID PACKAGES 6.1 GENERAL TRADES AND 22.2 PLUMBING & HVAC*** PROJECT DESCRIPTION: This project entails the filling of the existing pool and replacing it with a smaller therapy pool. Also included is the build-out of several classrooms, bathrooms and workrooms in the space the original pool used to occupy. SCHEDULE: December 2022 - June 2023 (a detailed schedule included with bid documents) BID PACKAGES: 6.1 General Trades 22.2 Plumbing & HVAC 1. CSM Project Safety and General Scope Requirements, unless otherwise noted below. 2. Verify interior and exterior pad elevations and building corners prior to commencing footing and slab placement or fine grading. Provide written acceptance to CSM prior to starting work. Commencement of work is acceptance of conditions. 3. Final grade and compact all subgrades beneath concrete placement, interior and exterior, to Contract Document dimensions, including positive flow off all concrete so that there is no standing water. This may include, but is no limited to, removal of ruts and additional final grading after other trades have finished their work. 4. Furnish and install all concrete footings, foundations, frost walls, interior slabs, exterior slabs, elevated slabs and related reinforcing steel within the specifications and architectural, structural, electrical and mechanical drawings. Include all means of placement, hoisting, pumping, conveying, etc., to accomplish this work per the updated project schedule. Provide shop drawings for all reinforcing steel. Shop drawings must be approved prior to placement of foundations and/or slabs. 5. Provide all chamfering of concrete, as indicated in Contract Documents. 6. Furnish and install fall protection in accordance with OSHA requirements at all openings and edges. 7. Furnish and install all formwork for all penetrations, box outs, and edging at all levels. 8. Mesh for slabs shall be furnished in sheets, only, and cut or welded on site to meet areas being poured. 9. Note requirements in specifications for providing layout of floor construction joints. The structural drawings indicate basic layout. Before beginning slab pours, actual layout must be reviewed by CSM and Architect/Engineer. Provide a dated pour schedule of floor slabs in accordance with the Schedule included in the Project Manual. Pour schedules must be reviewed and accepted at least four weeks prior to start of work on any of these items. Update the pour schedule daily with actual pour dates on Master Schedule located in CSM's field office. 10. Receive, unload, store, and install anchor bolts, embeds, sleeves, setting plates, and miscellaneous items furnished by this Bid Package and/or other Bid Packages, and embedded within the work of this Bid Package. Verify accuracy of installed elevation of base plates using a registered engineer and provide CSM an as-built drawing. Plate elevation and location must be within 1/8" (this is not an average) of plan dimensions prior to setting of structural steel. Anchor bolts and base plates furnished by Bid Package 5.1. This work is the responsibility of Bid Package 3.1 until the steel erector has signed off on their placement or set steel on them. BID DOCUMENTS PROJECT MANUAL - DKDC Pool Infill 10.07.2022 DRAWINGS - DKDC Pool Infill 09.13.2022 SPECIFICATIONS - DKDC Pool Infill 09.13.2022 Supplemental Project Manual - DKDC Pool Infill 11.01.2022 ADDENDUMS ADDENDUM 01 - DKDC Pool Infill 10.14.2022 CLARIFICATIONS CLARIFICATION 01 - DKDC Pool Infill 10.18.2022 CLARIFICATION 02 - DKDC Pool Infill 11.17.2022 RFIs – Submission period has closed RFI 001 - Earthwork Scope RFI 002 - Silt Sock Request RFI 003 - Fire Alarm Details RFI 004 - Flooring and Wall Tile RFI 005 - Pool Discharge Materials to Sump Basin RFI 006 - Door Hardware Sets RFI 007 - Existing Wood Door Veneer RFI 008 - Acoustical Ceilings RFI 009 - Pool Detail, Upper Slab, Floor Removal RFI 010 - Countertops RFI 011 - Existing Key System RFI 012 - Sills RFI 013 - Deleted RFI 014 - Structural Steel Under Pool Deck RFI 015 - Engineered Shoring RFIs – Not Yet Issued RFI 016 - Floor Tile Demo RFI 017 - Acoustical Ceiling Demo Schedule *RFI 016-017 has been released.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents