Similar Projects
Last Updated | 09/23/2022 12:01 AM |
Project Title | TCAT Maintenance Repairs West Region |
Physical Address | View project details and contacts |
City, State (County) | Crump, TN 38327 (Hardin County) |
Category(s) | Education |
Sub-Category(s) | College/University |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $710,000 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | TFM No. 09700, 09700A, 09700B Renovate restrooms in the Administration Building and the restrooms in Buildings 2 and 3. Replace fixtures, finishes, ceiling tile, lighting, piping and associated work. Add Alt. #1 - Men's restroom; Add Alt. #2 - Women's Restroom. A. Scope of Work includes interior renovations and plumbing upgrades to existing college campus restrooms and upgrades to the main drain line. Work will be performed on the Main Campus of TCAT- Crump located at 3070 US-64, Crump, Tennessee. B. Daily cleaning of the facility in the areas of construction will be required to the satisfaction of the Owner's Representative, as Classes will remain in session during the entire construction process. C. All construction employees must have identification badges from their employing contractor while on site and a sign-in roster will be required for control. D. Smoking is not permitted within building structures, construction area or within 50 feet of the building. Smoking is permitted within personal vehicles. E. Parking should be coordinated with Campus prior to Construction. The Drawings indicate a general Construction parking and staging area. If more parking area is needed the Contractor will have to coordinate that with his subs as parking within identified staff and student area will not be allowed. There is no "on street" parking allowed in this area |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |