Similar Projects
Nirdosh Gas Station
New Construction, Infrastructure - 5,400 SF
Conception
$1,500,000 CJ est. value
Warrenton, MO 63383

High School - Wright City R-II School District
New Construction, Build-out, Infrastructure
Design
$52,000,000 CJ est. value
Wright City, MO 63390

Boulder Valley Multifamily
New Construction, Infrastructure - 169,240 SF
Design
$62,000,000 CJ est. value
North Elkhorn Township, MO 63383

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Bridge Painting
Infrastructure
Results
MO

Job Order Contract for Concrete Pavement Repair
Infrastructure
Results
$250,000 to $500,000 est. value

2021 Bond - City of Warrenton
Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Warrenton, MO 63383

Orange Blossom 55+ Phase 3 Subdivision
New Construction, Infrastructure
Pending Verification
$8,000,000 CJ est. value
Warrenton, MO 63383

RFQ Engineering - Warren County, Veterans Memorial Parkway at Archer Road
Infrastructure
Post-Bid
$4,000,000 CJ est. value
Innsbrook, MO 63390

Asphalt Overlay on Bell Road
Infrastructure
Results
$190,000 est. value
Wright City, MO 63390

Oak Akres Villas / Warrenton
New Construction, Infrastructure
Pending Verification
$1,200,000 CJ est. value
Warrenton, MO 63383

Wright City Force Main Phase 2A
Infrastructure
Post-Bid
$200,000 CJ est. value
Wright City, MO 63390

Food Service Building Addition - Warren County
Addition, Infrastructure - 4,096 SF
Results
$1,219,500 CJ est. value
Warrenton, MO 63383

Refresco Beverages Expansion
Addition, Demolition, Infrastructure
Pending Verification
$22,000,000 CJ est. value
Truesdale, MO 63383

Last Updated 06/02/2023 07:03 AM
Project Title

ADA improvement on Route 47 in Warrenton

Physical Address View project details and contacts
City, State (County) Innsbrook, MO 63390   (Warren County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,263,115 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

****(1): Job J2P3355 Route 47, J, I-70 NOR WARREN County. ADA improvement on Route 47 in Warrenton, on Route J in Wright City, and I-70 North Outer Road in Wright City, the total length of improvement being 0.74 miles. ****(2): JobJ2S3356 Route CC, ZZ, 161, 19 MONTGOMERY County. ADA improvement on Route 19 and 161 in Montgomery City, on Route 161 Middletown, and Route CC and Route ZZ in Wellsville, the total length of improvement being 1.224 miles. Contract ID: 230421-B01 All questions concerning this project during the bidding process shall be forwarded to the project contact listed below. Kim Trainor, Project Manager N.E. District P.O. Box 1067 Hannibal, MO 63401 Telephone Number: 573-231-2786 Email: Kimberly.Trainor@modot.mo.gov All questions concerning the bid document preparation can be directed to the Central Office Design at (573) 751-2876. DBE Goal Percent: 7.00 If submitting a cashier's/certified check, the Bid Bond folder will not turn green. Range: $1M to $2.5M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Notice to Proceed: June 5, 2023 Completion Date: July 1, 2024 FAF 47-1(90), FAS S202(31) All questions concerning this project during the bidding process shall be forwarded to the project contact listed below. Kim Trainor, Project Manager N.E. District P.O. Box 1067 Hannibal, MO 63401 Telephone Number: 573-231-2786 Email: Kimberly.Trainor@modot.mo.gov All questions concerning the bid document preparation can be directed to the Central Office - Design at (573) 751-2876.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents