Similar Projects
Camp Burton Road Basin Utilities Camp Burton Lift Station, Force Main, and Gravity Sewer
New Construction, Infrastructure
Bidding
$19,000,000 est. value
Greensboro, NC

North Belmont Booster Pump Station
Renovation
Bidding
Belmont, NC

Sewer Pump Station No. 1 Improvements
Post-Bid
$524,959 est. value
Walnut Creek, NC 27534

French Broad River Intake Pump Station Project
Post-Bid
$10,000,000 to $15,000,000 est. value
Hendersonville, NC 28792

Booster Pump Stations #1 and #2 Rehabilitation Project
Results
Troy, NC 27371

Frances Haven and Farmington Pump Station Decommissioning
Results
Less than $500,000 est. value
Harrisburg, NC 28075

Dana Drive Pump Station Flood Mitigation Improvements
Renovation
Bidding
Laurinburg, NC

Highway 75 Booster Pump Replacement
Term Contract
Post-Bid
Monroe, NC 28112

Wastewater Pump Station and Sewer System Improvements
Results
Grifton, NC 28530

Lawson Creek Booster Station Replacement
New Construction
Bidding
New Bern, NC 28560

Waxhaw Gravity Interceptor, Pump Station and Force Main
Post-Bid
$6,000,000 to $7,000,000 est. value
Monroe, NC

Celeste Circle Lift Station Improvements
Results
Less than $171,940 est. value
Durham, NC 27701

Forlines Pump Station and Force Main Improvements
Renovation, Infrastructure
Bidding
Greenville, NC

Design Build Services for Mott`s Creek Pump Station Upgrades
New Construction
Post-Bid
Less than $5,900,000 est. value
Wilmington, NC 28412

FY2017 Wastewater System Improvements - Rosewood Mobile Home Park
Results
Lumberton, NC 28359

Last Updated 03/30/2022 10:02 AM
Project Title

Ellis Pump Station Emergency Response Facility

Physical Address View project details and contacts
City, State (County) Jacksonville, NC   (Onslow County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,100,000 to $1,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

HUB Goals: 10%. This project includes, but is not limited to the construction of the Emergency Response Facility of Ellis Pump Station outside of the floodway.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents