Similar Projects
Publix - Summers Corner / Summerville (Ladson)
New Construction, Infrastructure - 51,454 SF
Conception
$12,000,000 CJ est. value
Ladson, SC 29485

Sawmill Mixed Use Future Phases
New Construction, Infrastructure
Conception
$200,000,000 CJ est. value
Summerville, SC 29483

Limehouse Drive/Multi-Residential
New Construction, Infrastructure
Design
$18,000,000 CJ est. value
Summerville, SC 29485

Downtown Nexton Mixed-Use
New Construction, Infrastructure - 310,000 SF
Design
$100,000,000 CJ est. value
Summerville, SC 29483

Springview Lane Drainage Improvements
Infrastructure
Bidding
$700,000 CJ est. value
Summerville, SC 29485

Big Dan's Car Wash / North Charleston
New Construction, Infrastructure - 5,011 SF
Bidding
$1,500,000 CJ est. value
North Charleston, SC 29420

RFP D/B - Summerville Fire-Rescue Station 6
New Construction, Infrastructure
Post-Bid
$3,094,921 CJ est. value
Summerville, SC 29485

Harris Teeter Fuel Center #355 / Summerville
Demolition, New Construction, Infrastructure, Renovation
Post-Bid
$800,000 CJ est. value
Summerville, SC 29485

Construction Services Performed on AJW-242 Unstaffed Infrastructure Sustainment (UIS) Facilities On and Off Airport Operating Areas
Results
Less than $150,000,000 est. value

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Results

Widening - I-26 (187-194)
Infrastructure
Construction
$179,987,105 CJ est. value
Summerville, SC 29483

Wastewater Treatment Plant Expansion and Improvements
Infrastructure
Construction
$10,000,000 CJ est. value
Summerville, SC 29483

Coastal Crossroad Logistics Center Phase 1 and 2
New Construction, Infrastructure - 2,500,000 SF
Pending Verification
$200,000,000 CJ est. value
Summerville, SC 29483

BID Group Wood Processing Expansion
Addition, Demolition, Infrastructure
Pending Verification
$10,600,000 CJ est. value
Saint George, SC 29477

Intersection Improvement S-169 (Von Ohsen Rd)/S-881 (Lincolnville Rd)
Infrastructure
Conception
$2,100,000 CJ est. value
Summerville, SC 29485

Last Updated 09/20/2023 12:34 PM
Project Title

Debris Site Preparation

Physical Address View project details and contacts
City, State (County) Saint George, SC 29477   (Dorchester County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $234,651 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of 9/20, 2023, this project has not yet been awarded. It is anticipated to be awarded in October. Overview: The Town of Summerville is seeking sealed bids for the preparation of a site to temporarily dispose and manage debris generated by a natural disaster such as a flood, hurricane, ice storm, or other disaster that would generate large amounts of debris. The site is located off Stokes Bridge Road near Grover, South Carolina in western Dorchester County. The TMS# is 103-00-00-047 owned by Summerville Commissioner of Public Works. If you have any questions regarding this solicitation, please contact Scott Mcdonald at rmoore@summervillesc.gov. If you have any other questions regarding this email, please contact us at cservice@vendorregistry.com. All inquiries and questions related to this project must be submitted in writing, via email, to Russ Cornette (rcornette@summervillesc.gov) so that they can be addressed through a posted addendum. All registered bidders will receive an e-mail notification when project addendums are posted. The cut-off date for questions is Friday, August 18, 2019 at 1:00 p.mAll inquiries and questions related to this project must be submitted in writing, via email, to Russ Cornette (rcornette@summervillesc.gov) so that they can be addressed through a posted addendum. All registered bidders will receive an e-mail notification when project addendums are posted. The cut-off date for questions is Friday, August 18, 2019 at 1:00 p.m

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents