Last Updated | 09/04/2023 08:32 AM |
Project Title | Fire Hydrant and Valve Replacement Project |
Physical Address | View project details and contacts |
City, State (County) | Raymore, MO 64083 (Cass County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected September 2023 |
Bids Due | View project details and contacts |
Estimated Value | $258,750 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | ANTICIPATED SCOPE OF SERVICES: Replace 14 fire hydrants. All hydrants are to be Clow Medallion or approved equals. All hydrants/valves to be presumed unrestrained. Water to be shut off during replacement. Contractor to notify residents 48 hours in advance via door hangers of water service interruption. Install 6, six inch gate valves at 6 of the hydrants to be replaced. Replace the tees to the main along with the valves as necessary. Install 4, stainless steel tapping sleeves with valves adjacent to existing hydrants. Install new hydrants and cut the existing hydrant off below grade. Install Hydra-Stop, Insta-Valve 250s (or approved equals) at 6 locations. locations. Contractor is responsible for determining pipe diameter. Replace 75sq feet of sidewalk, if damaged, and replace two ADA ramps. Restore any damaged lawns or landscaping. Sod is to be used in maintained lawns, seed and Futerra F4 Netless blankets or approved equal in un-maintained areas. Straw is not allowed. Provide traffic control |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |