Similar Projects
T.B. Hanna Station Phase 2 - 23-PRK-008 - City of Raymore
Infrastructure
Conception
$332,000 CJ est. value
Raymore, MO 64083

T.B. Hanna Station Phase 2 - 23-PRK-008 - City of Raymore
Infrastructure
Conception
$332,000 CJ est. value
Raymore, MO 64083

The Other Place Office Development / Belton
New Construction, Infrastructure
Design
$2,500,000 CJ est. value
Belton, MO 64012

Concrete Sidewalk Installation and Maintenance
Infrastructure
Bidding
$300,000 CJ est. value
Peculiar, MO 64078

Concrete Sidewalk Installation and Maintenance
Infrastructure
Bidding
$300,000 CJ est. value
Peculiar, MO 64078

2022 Parking Lot Improvements
Infrastructure
Post-Bid
$200,000 est. value
Belton, MO

FY 23 Street Preservation Project
Infrastructure
Post-Bid
Belton, MO

Highway D Waterline Replacement
Infrastructure
Results
Belton, MO

Highway 58 Waterline Replacement
Infrastructure
Results
$313,900 CJ est. value
Raymore, MO 64083

Chase Bank Facility and Take 5 Oil Change / Belton
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Belton, MO 64012

Chase Bank Facility and Take 5 Oil Change / Belton
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Belton, MO 64012

Good Parkway Improvements - 26-PRK-001 - City of Raymore
Infrastructure
Conception
$580,000 CJ est. value
Raymore, MO 64083

Water Meter Infrastructure Replacement
Renovation
Bidding
$400,000 CJ est. value
Belton, MO 64012

2022 Street Overlay, Curb Replacement, Storm Sewer Project
Infrastructure
Post-Bid
$220,000 est. value
Raymore, MO

2022 Curb and Gutter Program
Infrastructure
Results
Harrisonville, MO

Last Updated 09/04/2023 08:32 AM
Project Title

Fire Hydrant and Valve Replacement Project

Physical Address View project details and contacts
City, State (County) Raymore, MO 64083   (Cass County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $258,750 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

ANTICIPATED SCOPE OF SERVICES: Replace 14 fire hydrants. All hydrants are to be Clow Medallion or approved equals. All hydrants/valves to be presumed unrestrained. Water to be shut off during replacement. Contractor to notify residents 48 hours in advance via door hangers of water service interruption. Install 6, six inch gate valves at 6 of the hydrants to be replaced. Replace the tees to the main along with the valves as necessary. Install 4, stainless steel tapping sleeves with valves adjacent to existing hydrants. Install new hydrants and cut the existing hydrant off below grade. Install Hydra-Stop, Insta-Valve 250s (or approved equals) at 6 locations. locations. Contractor is responsible for determining pipe diameter. Replace 75sq feet of sidewalk, if damaged, and replace two ADA ramps. Restore any damaged lawns or landscaping. Sod is to be used in maintained lawns, seed and Futerra F4 Netless blankets or approved equal in un-maintained areas. Straw is not allowed. Provide traffic control

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents