Similar Projects
Beaver Street Interceptor Rehabilitation / Replacement and new Beaver Street Pump Station
Renovation
Bidding
$2,000,000 CJ est. value
Franklin, MA 02038

Pump Station Improvements
Renovation
Post-Bid
$600,000 est. value
Westwood, MA 02090

Wastewater Pump Station Capital Improvements - General Bids
Renovation
Post-Bid
$1,500,000 est. value
Stoughton, MA

Construction Firm for the Purposes of Upgrades to Two Existing Sewer Ejector Stations
New Construction
Results
$300,000 est. value
Franklin, MA

Union Park Pump Station, Unmanned Pump Stations and Combined Sewer Overflow Detention and Treatment Facility
New Construction
Results
$4,389,533 est. value
Boston, MA

D'Angelis Water Treatment Plant PFAS Upgrades - General Bids
New Construction, Infrastructure
Post-Bid
$5,000,000 est. value
Millis, MA

South Stoughton Sewer Expansion, Pump Station
Infrastructure
Results
$900,000 est. value
Stoughton, MA

Hill Street Booster Pump Station
Infrastructure
Post-Bid
$1,700,000 est. value
Foxborough, MA 02035

Lake Drive Pump Station Replacement
Renovation
Results
$600,000 est. value
Needham, MA 02492

Braintree-Weymouth Pump Station Improvements - Filed Sub Bids
Renovation
Post-Bid
$9,950,000 est. value
Quincy, MA 02170

Braintree-Weymouth Pump Station Improvements - General Bid
Renovation
Results
$13,473,075 CJ est. value
Quincy, MA 02169

Security Improvements
Renovation
Post-Bid
$600,000 CJ est. value
Dedham, MA 02026

College Road Pump Station Improvements Project
Renovation
Results
$350,000 est. value
Wellesley, MA 02482

Tri-Town Regional Water Treatment Plant - Sub Bid
New Construction, Infrastructure
Post-Bid
$20,467,410 CJ est. value
Braintree, MA 02184

Potter Drive Wastewater Pump Station Generator Replacement - GC Bid
Infrastructure
Results
$162,647 CJ est. value
Bellingham, MA 02019

Last Updated 02/09/2023 11:05 PM
Project Title

2022 Pump Station Improvements - General Bid

Physical Address View project details and contacts
City, State (County) Weymouth, MA 02188   (Norfolk County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $1,150,000 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

The Base Bid scope of work includes equipment and structure rehabilitations, demolition and replacements and appurtenant work at the Alton Terrace sewer pump station and the Wituwamut Road sewer pump station in the Town of Weymouth. The Alternate Bid 1 scope of work includes equipment and structure rehabilitations, demolition and replacements and appurtenant work at the Seaver Road sewer pump station in the Town of Weymouth. The Alternate Bid 2 scope of work includes equipment and structure rehabilitations, demolition and replacements and appurtenant work at the Healy Road sewer pump station in the Town of Weymouth. Questions addressed to Weston & Sampson Engineers, Inc., Attn: Carolyn Mahoney (mahoney.carolyn@wseinc.com) 978-532-1900 All bids for this project are subject to applicable bidding laws of Massachusetts, including General Laws Chapter 149, Section 44A to 44J inclusive, as amended.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents