Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Stage, Sound and Lighting Services
Alteration
Bidding
Somerton, AZ 85350

Generator Installations for Seven Video Tower Sites Near Nogales, AZ In Support of Customs and Border Protection (CBPp)
Term Contract
Bidding
Nogales, AZ

Downtown Electric Upgrade
Post-Bid
Safford, AZ 85546

Generator for Adobe Mountain School
Post-Bid
Phoenix, AZ 85027

D--SCADA EMS Grid Control Across WAPA Regions
Results
Phoenix, AZ 85009

Maintenance, Repair and Operating Supplies Including Generator Maintenance Services
Term Contract
Results
AZ

Omega Alpha Academy - Installation of Solar Panels
Alteration
Construction
Douglas, AZ 85607

Z--Senator Wash - SCADA Upgrade
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Yuma, AZ

Electric Vehicle (EV) Charging Stations - Equipment and Related Services
Alteration
Bidding
Tucson, AZ

Warehouse Stock Replenishment Electrical Materials
Post-Bid
Fort Defiance, AZ

Hopi Generator Preventative Maintenance
Results
Polacca, AZ 86042

Electrician Services On Call List
Post-Bid
Bisbee, AZ 85603

Multi-Facility LED Install
Results
$1,000,000 to $5,000,000 est. value
Tucson, AZ

Last Updated 01/07/2022 03:36 PM
Project Title

Headworks Motor Control Center Repairs

Physical Address View project details and contacts
City, State (County) Casa Grande, AZ 85122   (Pinal County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $150,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The Contractor shall be responsible for providing a variety of services as may be required to analyze, clean, repair, replace and provide inspection assessment of existing Headworks Motor Control Center at the City’s wastewater treatment plant. The selected Contractor(s) shall be responsible to coordinate efforts with City Wastewater staff to perform all items listed in the scope of work but not limited to those items. All items listed in the scope of work but not limited to those items will be completed as directed during the 2022 fiscal year cycle. Coordination will be limited to Wastewater staff. Please note operations vital to plant compliance must not be interrupted while performing any items listed in the scope of work. Adequate measures to continue these operations will be required. Anticipated tasks required to be performed are as listed but not limited to: Analyze existing Headworks Motor Control System Provide detailed analysis and recommendations of needed repairs/replacements. Contractor is responsible for all safety needs. Provide detailed schedule of all work to be performed. H2S monitoring and analysis. Perform all needed repairs and replacements as agreed to with City staff. Provide all schematics/as builts to City staff at completion.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents